The objective of this experiment is to determine appropriate values of E'o and cv to calculate the magnitude and timescale of soil settlement and heave below the office block and the car park described in example problem Q1 (note that Q1 in this booklet differs slightly but significantly from Q1 in SMCA). An oedometer test must be carried out which replicates as far as possible the typical stress changes expected to occur in the field. (Hint: the initial and final values of vertical effective stress calculated in Q1 define the appropriate stress ranges which must be included in the oedometer test). It is up to you to determine the stress increments for the oedometer test. You must do this, and have your proposals ready to be checked by the demonstrator when you come to the laboratory for the practical session.
The following notes describe the general experimental procedure and the determination of E'o and cv from the data you will obtain.


Q1. An office block with an adjacent underground car park is to be built at a site where a 6m-thick layer of saturated clay (γ = 20 kN/m3) is overlain by 4m of sands and gravels (γ = 18 kN/m3) and underlain by permeable fractured bedrock. The water table is at the top of the clay layer, and pore water pressures are hydrostatic below this depth. The foundation for the office block will exert a uniform surcharge of 75 kPa at the surface of the sands and gravels. The foundation for the car park will exert a surcharge of 30 kPa at the surface of the clay, following removal by excavation of the sands and gravels. Calculate the initial and final vertical total stress, pore water pressure and vertical effective stress, at the mid-depth of the clay layer, (a) beneath the office block; and (b) beneath the car park. Take the unit weight of water as 9.81kN/m3.

Initially σv = 132 kPa; u = 29.4 kPa; σ'v = 102.6 kPa. Finally beneath the office block σv = 212 kPa; u = 29.4 kPa; σ'v = 177.6 kPa. Finally beneath the car park σv = 90 kPa; u = 29.4 kPa; σ'v = 60.6 kPa

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91520587
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As