Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

OBJECTIVES:

As a civil engineering student in Oman it is very important to increase ones knowledge on the subject of construction equipment and methods. Through investigation on the local applications and costs of existing construction equipment in Oman students will be familiar with the local application of these instruments and also common problems that occurs in Oman while using these equipment. Therefore they will be able to put this knowledge in practice later in their career to select the appropriate equipment that meets the purpose required to solve a specific problem on construction sites.

OUTCOMES:

• Apply the knowledge gained above to develop safe and sustainable solutions to site situations;

• Appraise the solutions developed above to propose the most desirable solution in the circumstances

• Present the solutions in a form which could be understood and acted on by site personnel

TASKS

1. Review any five of available plants and earthwork equipment in Oman. Write a report regarding the differences you discover in the major four characteristics (e.g. Capacity, speed, economy factor, etc.) of the machines.

2. What is the average cost of hiring or purchasing earthwork plants in Oman?

3. Students are requested to investigate on local applications of the equipment they choose in task 1, in Oman. How are they used in real life situation? i.e., construction site. Explain your observations of the local applications of this equipment in Oman. Moreover report one specific problem that is common in application of this machine in Oman and discuss the possible solutions

Instructions

• Choose a specific machine from one production but different models(e.g. excavator , Caterpillar , model A-2012 and model B-2013) or choose one machine from two different production but with similar applications ( e.g. bulldozer JCB S130LC model and Bulldozer Komatsu D65EX ). Caterpillar produces different models of excavator you can identify the differences between the models or similar model of a plant in different making like Caterpillar and Komatsu.

• You can review the brochures, and catalogues of companies that produce machinery online or through contacts in contractor or consultant offices.

• In order to find out about costs you can contact contractors and companies who offer the plants for rentals or purchasing in Oman.

• Next step is to put this information into a report format. You must use your writing skills to compose an essay. An essay must have introduction, the main part or the body and a conclusion

• For task 2 it is suggested to prepare the answer in a table with proper referencing

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91566971
  • Price:- $220

Guranteed 48 Hours Delivery, In Price:- $220

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As