After the successful completion of this exercise you will be able to:

- Acquire laboratory data at an appropriate level of accuracy and interpret it in terms of underlying engineering principles.

- Present relevant information and analysis in a clear and unambiguous way. These are module learning outcomes 3 and 5 which are common to both modules.6. Aims and objectives

The specific aim of this coursework is to undertake an investigation to validate the theory associated with concrete mix design and the use of Pulverised Fly Ash (PFA) as a partial cement replacement, and Self-Compacting Concrete (SCC). The objectives are:

1. Design a SCC trial mix using the BRE method as a basis, with PFA as a partial cement replacement and to provide a 500 kg/m3 cementitious powder content, with super plasticiser and viscosity modifying admixtures.

2. Assess whether workability tests have been conducted in accordance with standard test methods and assess the significance of the results.

3. Perform standard tests on samples to determine the mechanical properties of the hardened concrete.

4. Re-design the trial mix using the observed workability and strength results.

5. Assess the embodied carbon of the trial mix using the Inventory of Carbon and Energy database.

6. Research and discuss the efficacy of using PFA as a partial cement replacement and self-compacting concrete to improve the sustainable use of concrete in practice.

7. Procedure

It is not necessary to re-attend the laboratory sessions for this resit coursework. Use the data provided in this report to complete your investigation.

Trial mix design

Design a 0.05 m3 trial mix to the following specification:

Characteristic strength: C32/40

Test age1: 28 days

Percentage defectives: 5%

Slump: 100 mm

Slump flow: 800 mm (but use your target slump for the design process)

Cement: CEM1 class 42.5

Coarse aggregate: 20 mm maximum size, crushed Fine aggregate: 70% passing 600 μm sieve

Notes:

The mix should be designed to have a powder content of at least 500 kg/m3. This may require the use of PFA, which may be assumed to develop 30% of the strength of an equivalent mass of cement (i.e. C+0.3F), up to a maximum proportion of 40% PFA. Any PFA content in excess of 40% should be assumed to not contribute to the strength and is merely acting as an inert mineral filler, which may require the cement content to be increased in order to achieve the required strength.

Concrete Casting

During mixing an additional 0.5 litres of water was added. The mix achieved a slump of 80 mm when tested to BS EN 12350-2:2009 Testing Fresh Concrete, Part 2: Slump test. During the slump test both layers of concrete were tamped 25 times.

The following admixtures were then added to the mix:
- V-MAR 6 manufactured by Grace Construction Products
- Conplast SP430 manufactured by FOSROC

From the manufacturers product information leaflets, available on the module web, determine the appropriate minimum-range amount of these admixtures that should have been initially added to the mix in order to try to achieve the desired SCC. On inspection of the concrete mix during the mixing testing it was decided to add an additional 20% of the minimum amount of super plasticiser.

The workability of the SCC mix was then measured using:

Slump flow (BS EN 12350-8:2010 Testing Fresh Concrete, Part 8: Self-compacting concrete - Slump flow test) V-funnel (BS EN 12350-9:2010 Testing Fresh Concrete, Part 9: Self-compacting concrete - V-funnel test)

L-box (BS EN 12350-10:2010 Testing Fresh Concrete, Part 10: Self-compacting concrete - L-box test) The results obtained are recorded in Appendix A:

During the V-funnel test the gate was opened about 30 s after the funnel had been filled with concrete. During the L-box test there was some sign of segregation of the mix.

The following concrete test samples were produced: 3 No. 150 mm cubes 3 No. 100 mm diameter, by 200 mm long cylinders 24 hours after casting the samples were placed in a curing tank and left underwater until being tested at 28-days.

Concrete Testing

The results table in Appendix A contains the mass of each sample prior to testing and the maximum compressive load applied.

The Report Results

Do not quote results without explaining how they have been obtained by showing typical calculations for at least one result (and then tabulate the rest for similar samples).
For the casting and sample testing:
- Present the trial mix design.
- Present the results for the slump flow and passing ability ratio.
- Present the results for the concrete sample density and compressive strength.
- Determine the characteristic strength of the concrete trial mix from the samples tested.

Discussion
For the casting and sample testing:
- Review the description and notes in the sample casting section and discuss the validity of the experimental results.
- Critically assess whether the trial mix achieved the specification and is suitable for use as a SCC. Cite and compare all of the appropriate results (and assumptions given your assessment of the validity of the results) to justify your decision.
For the mix re-design:
- Re-design the mix in order to achieve the design specification - adjust the trial mix proportions to achieve the target slump, characteristic strength and expected density. Do not forget to include the effect of any changes to the w/c ratio made by changing the water content during mixing.
- Suggest new quantities for admixtures in order to achieve the SCC workability specification. You should explain your mix re-design methodology and procedure in this section of the discussion.
For the sustainability assessment:
- Using data from the "Inventory of Carbon and Energy" (see module web) determine the embodied carbon per kg of your blended cement, and SCC mix, and compare them to the values you would expect for a non-SCC mix which did not use a PFA cement replacement but had similar strength performance. Hence explain what these results show regarding the use of PFA as a cement replacement material, and the use of SCC, for sustainable construction practice. Cite other reference sources and pertinent information as required to justify your answer.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91829423
  • Price:- $250

Guranteed 48 Hours Delivery, In Price:- $250

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As