Ask Civil Engineering Expert

Mini-case study: Milo's Home Improvement was recently named as an authorized distributor of lawn tractors by the Dear John Company (DJC-whose advertising proclaims, "You'll love our tractors so much you won't care if she leaves you for someone who's not so attached to lawn care.") Milo's retail network covers the Southeastern United States. You are the newly hired logistics analyst for Milo's, and you've been asked to evaluate the company's current replenishment policies for optional accessories to support lawn tractors. While Dear John tractors are built at a plant in central NC, the accessories carried by Milo's are supplied by DJC's distribution center (DC) in Memphis, TN, since these items are built by various manufacturers from around the globe. The current contract terms between DJC and Milo's dictate that Milo's must arrange and pay for freight transportation to its facilities. Milo's currently ships most tractor accessories via truckload (TL) from DJC's Memphis DC to its own DC in Atlanta. Some accessories are shipped via less-than-truckload service, however. For ease of discussion, let us consider only five items, as specified in Table 3.12. Since sales are concentrated in the relatively temperate Southeastern United States, we can assume that aggregate demand for tractors and accessories is reasonably steady across the year. Daily demand, however, exhibits some uncertainty. Although detailed standard deviation data for demand is currently not available, Milo's has historically used a coefficient of variation (standard deviation divided by mean) of 0.3 to estimate the uncertainty in daily demand in its past inventory planning. The order fulfillment lead time from the manufacturer DC (DJC) to the retailer DC (Milo's) is a fairly consistent 3 days. Both DCs operate 365 days per year. Other important parameters gathered from company records appear in Table 3.12.

116_ac417c06-162a-4a19-b5a5-abb4d06ddf9b.png

(a) For each item, compute the economic order quantity. Is the EOQ a feasible order quantity for each item? Why or why not? For any item where the EOQ is not a feasible order quantity, what order quantity do you suggest?

(b) Using your computed or suggested order quantity values from (a), compute the reorder point for each item that achieves an expected target fill rate of 98%. (See expressions (3.16) and (3.20) in the chapter for hints on how to do this.) Your computed reorder points should allow only non-negative safety stock levels.

(c) Given their similar characteristics, you have suggested that the fan, canopy, and double-bucket holder could be ordered jointly in consolidated shipments. Compute the optimal number of orders for this approach. First, do this using the formula developed in the chapter (expression (3.29)), and then as a constrained optimization problem using Excel Solver. Are these solutions feasible?

(d) Since demand is uncertain, using separate (Q, R) ordering policies for the three items considered in (c) is not guaranteed to result in orders that occur at the same points in time. As an alternative, use the optimal order frequency implied by the Solver solution from (c), mentioned earlier, to compute order-up-to levels for those three items for a periodic-review (S, T) system. Your order-up-to levels should be set to achieve a 90% in-stock probability target.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92218486

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As