Materials requirements planning:

Materials requirements planning (MRP) is a set of process for converting forecasted demand for a manufactured product into a requirement schedule for the components, subassemblies, & raw materials comprising that product. A closely associated concept is that of the master production schedule (MPS), which is a specification of the projected needs of the end product by time period. The explosion calculus represents the set of rules and procedures for converting the MPS into the requirements at lower levels. The information needed to do the explosion calculus is contained in the product structure diagram and the indented bill-of-materials list. The two key pieces of information contained in the product structure diagram are the production lead times needed to produce the specific component, and the multiplier giving the number of units of the component required to generates one item at the next higher level of the product structure.

Most of MRP systems are depend on a lot-for-lot production schedule. The number of units of a component produced in a period is the same as the requirements for that component in that period. However, if setup and holding costs may be estimated accurately, it is possible to find other lot-sizing rules that are more economical. We have also treated the dynamic lot-sizing problem when capacity constraints exist. One of the restrictions of MRP is that capacities are ignored. This is especially important if lot sizing is incorporated into the system. Determining optimal solutions to a capacity-constrained inventory system subject to time-varying demand is very difficult problem. System nervousness is one difficulty that arises whereas implementing the MRP system, the term refers to the unanticipated changes in a schedule that result when the planning horizon is rolled forward by one period. Another problem is that in many circumstances, production lead times based on the lot sizes; MRP assumes that production lead times are fixed; still another problem is that the yields at various levels of the process cannot be perfect. If the yield rates can be accurately estimated in advance, these rates may be factored into the calculations in a straightforward manner. However, in many industries the yield rates may be difficult to estimate in advance. Generally MRP II is implemented to overcome some difficulties involved in implication procedure of MRP. It integrates financial, accounting and marketing functions of the production planning system.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M9520370

Have any Question?


Related Questions in Mechanical Engineering

Problem on shaft -assuming no frictional losses a torque of

Problem on Shaft - Assuming no frictional losses, a torque of T = 750lb·in is applied through the shaft of gear F in order to drive the roller chain at point B at a constant speed. The chain sprocket has a pitch diameter ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

Structural mechanics questions -q1 a 150-lb bucket is

Structural Mechanics Questions - Q1. A 150-lb bucket is suspended from a cable on the wooden frame. Determine the resultant internal loadings on the cross section at D, and at E. Q2. The shaft is supported at its ends by ...

5star questions amp answers1a define heat treatment bname

5 STAR QUESTIONS & Answers 1. A) Define Heat treatment B) Name different types of heat treatment processes C) Write any 4 purposes of Heat treatment 2. Explain various Heat treatment processes 3. A) Compare Thermo plasti ...

Life cycle assessmentfor your chosen service eg white board

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As