problem 1:
Critically discuss types of the planning.
problem 2:
Illustrate out the term fixed cost and Variable cost.
problem 3:
Critically illustrate the types of cranes.
problem 4:
Discuss any four equipments which are employed for lifting materials.
problem 5:
Provide the application of the fork lift trucks.
problem 6:
Illustrate out the term OHT crane.
problem 7:
prepare down the drawbacks of screw coneveyors.
problem 8:
Make a distinction between hydraulic and pneumatic conveyors.
problem 9:
Illustrate out the term incoming material control.
problem 10:
Illustrate out the types of storage racks.