Keywords of Road Pavements:

Pavement : That part of a road which structurally supports the vehicles travelling on a road.

Flexible Pavement   : A layered system of pavement withstanding wheel loads by lateral distribution.

Rigid Pavement : A cement concrete pavement having a slab of high strength and withstanding external loads by beam action.

Wearing Surface : The topmost layer in a flexible pavement.

Base Course : The layer immediately below the wearing surface in a bituminous course.

Granular Sub-base (GSB)  : The bottom-most layer of a flexible pavement that rests on the sub-grade.

Sub-grade : The top portion of the soil embankment that supports the pavement.

Drainage Layer : The bottom-most layer of a pavement (flexible or rigid) that serves to drain away the water entering through the pavement layers.

Borrow Pits : Pits dug to borrow earth for embankment construction.

Damaging Power : The damage on overloaded axle causes to a pavement as compared to a standard axle load.

Vehicle Damage Factor (VDF) : The damage caused to a pavement by each commercial vehicle.

Load Distribution Factor : The traffic to be considered in the design lane as a fraction of the full traffic in both directions.

Design Period : The number of years for which a pavement is designed.

Traffic Growth Rate : The rate at which traffic grows every year over the design period.

Million Standard Axles (msa) : The repetitions of the standard axle load in millions over the design period.

Soil Stabilisation : Process of treating a soil to improve its properties.

Mechanical Stabilisation : Blending soil with better materials to obtain a better particle size distribution.

Chemical Stabilisation : Addition of additives like lime, cement, lime- flyash, bituminous materials to soil to improve its properties.

Brick Pavement : Pavement using full bricks laid flat or on edge.

Over-burnt Brick Ballast    : Aggregates formed by breaking over-burnt (Jhama Metal)    bricks.

Stone Soling : A pavement layer using stone boulders.

Water Bound Macadam : A pavement layer with aggregates held together by a film of screenings and binding material in the pressure of water.

Wet Mix Macadam  : A layer of graded aggregates mixed with water in a plant and laid by a paver.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9519072

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As