INTRODUCTION

The purpose of this practical assignment is to test your ability to carry out the field work detail survey and process the data of a small area. The detail survey is to be conducted for the purpose of future construction work; you will need to decide on what detail will be relevant and what does not need to be recorded.

TASK

In your practical group, you are in turn to:

- Set up the job (s) on the total station and enter the codes required, thus setting up your code library, additional codes can be added in field if required.

- Using the existing Permanent control points bring horizontal and vertical control into the area that is designated, by first identifying the locations of your station points and level these in, then use the total stations to bring horizontal control to the area and ensure that you close back onto the permanent markers, to an accuracy of 1:10,000. You will need to conduct a resection initially, both by using the total stations and by hand (using the formulas demonstrated in the lecture).

- Conduct the survey ensuring that you have recorded sufficient data points to adequately portray the area. I believe something in excess of 1000 points will define the area.

- The detail that you are required to record includes the location of existing services and infrastructure (pits, footpaths, man-made features), natural features including natural surface levels, trees, waterways and water bodies.

- Make sure you record a minimum of two recoverable points each week. I.e. these can be signs or something that can be located precisely. When you go out the following week, you need to record the location of these two points again for reference, so you have something to tie your weeks together and so that you can check the orientation of your data for each week.

- The data should be downloaded each week before the commencement of the next practical session, preferably at the conclusion of each practical session. (refer to instructions for downloading the instruments on the lms).
- The downloaded data should be in the form of an ASCII file. This can be opened in Notepad (do this just to check that it has downloaded correctly).
- Once you have noted the form of the data (i.e. PENZD or PNEZD comma or space delineated) you can import your points directly into the template (download this from the lms) for AutoCAD, note you can import the points into CAD using any computer running Civil 3D but the downloading of the data needs to be completed on the computers located in the storeroom.
- You will add to this file every week. Take note of any corrections that may need to be made (i.e. wrongly oriented survey data etc).
- Produce the detail survey on the appropriate CAD program.

The coordinates you will need are;

Point

Easting

Northing

RL

TBM1

327717.915

5823323.828

73.912

TBM2

327763.876

5823325.357

71.742

TBM3

327791.465

5823326.028

71.575

TIPS FOR CONDUCTING A SUCCESSFUL DETAIL SURVEY
o Plan the survey in advance. Look at the area; decide on the features/detail which needs to be recorded.
o Decide on how control is going to be brought to the area.
o Plan the location of your station points and set up your control network first, ensuring that the entire area can be covered from your station points (record these points first).
o Plan the order that you are going to record the detail in (hint: boundaries are generally recorded and established first).
o Traverse through the area, using your control points and record all relevant detail.
o Always download your data at the end of each practical session to isolate errors which may have occurred in any practical.
o Always keep a copy of your raw data as backup.
o Save a copy of each practical session's work in a separate file.

WRITE UP AND RESULTS

Expected layout of Practical Report:

1. Introduction

o Clear outline of what the practical exercise entails and what is included in the report i.e. the form that the results will take etc, 200 - 250 words.

2. Equipment and Method

o A list of the equipment that you used for your practical.

o A clear concise outline of "YOUR" method. It should be written in such a way that someone having only your practical report could go and complete the practical following your methodology. It can take either paragraph form or dot point form. Your method should be descriptive and written in past tense. It should include how you approached the survey including the order in which the detail was recorded. DO NOT include what buttons etc you pressed on the total station to record the detail (this is excessive detail). DO include what you recorded each week.

3. Results

o A copy of your resection calculations and a comparison between these and the coordinates obtained from the total station including the margin of error.

o An A3 pdf of your Detail survey. It does not have to be in colour, however varying line types and thicknesses are recommended to help distinguish between features such as footpaths, fences and drainage lines. Your printout should include the following essentials:

A completed title block with the date of the survey, where the area is located, plan number, who completed the survey,

scale,

north point,

border,

legend,

Appropriate dimensions and labeling - remembering the detail survey was for the purpose of future construction work, therefore the plan should provide information that can be used for this purpose.

o An A3 pdf of your digital terrain model surface showing your TIN complete with breaklines, highlighting drainage and other features.

o A copy of your raw survey data (ascii format) and your surface data.

o Quantification of errors encountered in the field (both linear and angular), this can found by closing back to one of the permanent markers.

4. Discussion

o Discussion of "YOUR" results. This should include justification for the level of accuracy achieved along with any difficulties experienced during the practical exercise. Suggestions for how you could have achieved more accurate results should also be included. Please note: any suggestions on how you could achieve more accurate results need to be realistic, achievable and does not include changing equipment or going out on a different day in more favorable weather conditions.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92277711
  • Price:- $45

Guranteed 36 Hours Delivery, In Price:- $45

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As