Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Individual Projects

For each project the aims are

- to show the effect that the sub-layer thickness has on the calculation of the settlement
- to determine the maximum differential settlement under the foundation
- to discuss the accuracy of the settlement calculations

To determine the initial void ratio assume Gs = 2.65. Assume also that settlements of any sand and gravel layers can be ignored

A. A square building (15 m x 15 m in plan) is to be constructed on a site where the soil profile consists of 3 m of clay with an over-consolidation ratio of 5 overlying a 5 m thick layer with an over-consolidation ratio of 1, which overlies rock. The soil properties are Cc = 0.35, Cr = 0.07 and γsat = 20 kN/m3 for both clays, and the water table is 1 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building.

B. A building is to be constructed with a ring beam foundation on a site where the soil profile consists of 3 m of dense sand overlying a 5 m thick layer with an over-consolidation ratio of 1, which overlies rock. The soil properties of the clay are Cc = 0.25, Cr = 0.05, γsat = 18 kN/m3, for the sand γsat = 18 kN/m3, and the water table is 2 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building. Determine the differential settlement between the centre line of the ring beam and under the centre of loaded area of the beam. The inner and outer radii of the ring beam are 8 m and 12 m respectively

C. A rectangular building is to be constructed on a site where the soil profile consists of 5m of clay with an over-consolidation ratio varying linearly from 2 at the surface to 1 at 5 m, overlying a 7 m thick layer with an over-consolidation ratio of 2, which overlies rock. The soil properties are Cc = 0.3, Cr = 0.08 and γsat = 20 kN/m3 for both clays, and the water table is 1 m below the soil surface. Determine the settlements when a stress of 125 kPa is applied by the building over an area of 12 m × 7 m on the soil surface.

D. Figure 1a shows the elevation of a site where a building applying a uniform stress of 100 kPa over a 12 m square foundation is to be demolished. An old brittle pipe carrying critical infrastructure lies 4 m beneath one edge of the building as shown in the plan view in Figure 1b. The soil profile consists of 2 m of dense gravel with γdry = 17.2 kN/m3 which overlies a 6 m thick clay deposit. The water table is 2 m below the surface, level with the top of the clay layer. The clay layer has properties Cr = 0.04, Cc = 0.4, OCR = 1, γsat = 17.75 kN/m3. The clay is underlain by impermeable rigid rock.

Determine the settlement of the pipe at points X and Y when the building is demolished and the stress of 100 kPa is removed. It may be assumed that the pipe moves with the surrounding soil.

1267_SOIL MECHANICS.jpg

E. A circular grain silo is to be constructed on a site where the soil profile consists of 20m of clay overlying rock. The over-consolidation ratio varies linearly from 5 at the surface to 1 at the base of the clay layer. The clay properties are Cc = 0.25, Cr = 0.04 and γsat = 18.5 kN/m3, and the water table is 1.5 m below the soil surface. Determine the settlements when a stress of 150 kPa is applied by the tank which is 12 m in diameter.

Attachment:- Assignment.pdf

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92482545
  • Price:- $60

Guranteed 36 Hours Delivery, In Price:- $60

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As