problem 1: What are the fundamental differences between the CRT, BOX and BOXN wagon?
problem 2: describe the Air brake system of a BOXN Wagon. What are the different parts? What are the benefits of air brake over the vacuum brake system?
problem 3: What are the parts under the control of a Production Engineer (P.E.) in a workshop? Describe in brief, the responsibilities of different sections.
problem 4: Illustrate the typical organizational structure of a workshop? What is the responsibility of a Production Engineer?
problem 5: In brief describe bathtub curve group replacement and its application to preventive maintenance schedule on Railways?
problem 6: Please describe the organization of a workshop.
problem 7: What are the different rests that a Loco Pilot is entitled to?
problem 8: What do you mean by the term crew lobby? What registers and records are kept in the lobbies?
problem 9: Describe the basis on which the crew links are made up of.
problem 10: What protections are taken by crew controller throughout signing on and signing off of a loco pilot? What registers are filled or seen by a loco pilot throughout signing on and signing off?