Given: A tank with a volume (?) of 5,000 gal contains salt solution at an initial concentration (C0*) of 70,000 mg/L, but the concentration in the tank (C) needs to be reduced to 500 mg/L. Two approaches are being considered as indicated below (Alternatives 1 and 2).

Alt. 1: Flush tank with clean tap water while tank is mixed. Flowrate into the tank (QIn) and flowrate out of tank (QOut) are each 40 gpm (both flows are limited by the drain pipe capacity). If you do not derive equations used (which is not required), identify the source of the ones used with specificity; Define all variables used.

Alt. 2: First decant a portion of the salt solution at a flowrate (QOut) of 40 gpm, then replace the decanted volume with clean tapwater at a flowrate into the tank (QIn) of 100 gpm.

Required: a) Determine which method will accomplish the job in the shortest time.

b) Determine the difference in clean water used/ wastewater generated (gal.) by each method.

c) Of course our time is valuable and the importance of accomplishing the task quickly is obvious. Rather than discussing time, discuss, from the standpoint of sustainability, the importance of:

1) conserving (not wasting) clean water, and

2) minimizing the generation of waste brine (salty water) in the Central San Joaquin Valley.

Be thoughtful; Simplistic answers will not receive much credit. Include in your discussion:

the long-term outlook of groundwater reserves in the Central Valley

the challenges we face with respect to disposal of waste brine solution; what are the legal ways of doing this in the Valley? Note that it would not be legal to put brine in the sewer or percolate it into the ground due to the negative impact both would have on the groundwater.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91097405

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As