Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Given a four-legged pre-timed signalized intersection with one exclusive left turn lane, one through lane and one through/right lane on each approach (all approach and receiving lanes are 12 ft. and there is a 4-foot raised median separating the left turns from the opposing traffic lane), a 35 mph speed limit on all approaches, and the following traffic characteristics -

Peak Hour Volumes EB WB NB SB
Left 107 134 88 106
Through 599 653 432 487
Right 142 135 108 112
PHF 0.9 0.9 0.9 0.9
Arrival Type 4 4 3 3

Other input data - 3% heavy vehicles, no parking, no buses, no bikes or pedestrians, level grade on all approaches, in a non-CBD area.

1. Determine the appropriate yellow and all-red interval to use for each phase. Assume a 10 ft/sec2 deceleration rate, a one second reaction time, and a 20 ft. vehicle length. Round up yellow and all-red times to the nearest ½ second.

2. Assuming protected-only left turns, manually calculate the saturation flow rates for all lane groups. For the exclusive through and through-right lanes, assume the through movements are distributed to equalize the flow ratios.

3. Develop a protected-only left turn phasing plan that minimizes sum of critical v/s.

4. Estimate the optimal cycle length using the HCM Method with Xc = 0.9 and based on the HCM lost time/extension of effective green assumption. Round the estimated optimal cycle length up to the nearest 5 seconds.

5. Calculate all interval timings (critical and non-critical phases) for the optimal (rounded) cycle length.

6. Develop the queue accumulation polygon for the westbound exclusive through lane group and calculate the total uniform delay and average uniform delay per vehicle.

Calculate the incremental delay for the westbound exclusive through lane group and determine the lane group level of service.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91088433

Have any Question?


Related Questions in Civil Engineering

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As