Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Mechanical Engineering Expert

Get rock grinding machine price work as long as possible for you

Some information for choosing balls:

1. when the hardness of the material is big, try to choose a larger diameter steel ball.

2. when high-pressure grinding mill diameter and impact is greater, try to choose a smaller steel ball diameter.

3. using the dual position separators, its ball diameter must be smaller than that of the single-layer diaphragm plate of the same discharge cross-section.

Preparatory work before the cement ball mill operation: cleaning the inside workshop, the tools, used in construction should be completely evacuated.

Check the cleaning of the three-ring micro powder mill itself:

1. if the internal part of mineral trapezium mill has articles and debris;

2. if the discharging hole of the marble raymond mill and vacuum tube has debris;

3. if the bearing and the outer cylinder of ball mill clean;

4. make the coupling parts, ball mill bearing, reducer, motor clean;

5. blow the compressed air of the motor away , check if the interior of the motor has debris.

Other information:

1. before the ball mill operation, first make high-pressure oil pump operate, use the high-pressure oil film to hold up the ball mill, forming a floating, and reduce the torque of the ball mill, then put the oil into ball mill bearings and lubrication part.

2. check if the cooling water pipe has clogging, before test ball mill, open cooling water pipe joints, and flush the pipe until the cooling water is clean.

Shanghai JOYAL Machinery Co., Ltd has many years' of technological power and experience accumulation of manufacturing and management of ore concentrator, and our powder machine has many advantages such as simple and reasonable structure, high independent impact crushing ability, super low operational cost and the most competitive price. This machine has the most competitive price and the most reliable quality so that it is the top choice for the high performance crushing equipment.

Vibration trajectory is a complex space curves. The curve in the horizontal projection is a round. Adjust the exciting force under rotating weight, and then you can change the amplitude. Change the spatial phase angle under the weight, we can change the shape of the curve of the sieve surface trajectory, and then change the trajectory of the screen surface material. The vibrating screen uses the transducer excitation generated by the multiplexed rotation vibration to work. Oscillator on the rotating weight make the screen surface plane do whirling vibration, while the lower rotating weight cone rotary vibration sieve surface, and their joint effect is the complex rotary-type vibration sieve surface.

Sand production line mainly through the vibrating sieve to filter the materials particles, and finally achieve the specified required specifications! Today, let me introduce the key role of vibration sieve in the sand production line system! The vibrating screen equipment is composed of the exciter (vibration motor), damping device, the base, the screen surface, screen box, dust cover, drop hopper parts, vibrating screen has a small size, easy installation layout, high screening efficiency, low energy consumption, a high degree of wear-resistant, and noise generated, production safety and other significant characteristics. And sieve, sieve with a variety of materials and installation materials, a variety of industries to meet the demand for different screening and screening efficiency can also be based on the actual needs of users, customers tailored screening equipment, build customer most satisfactory equipment products.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91346827
  • Price:- $25

Guranteed 24 Hours Delivery, In Price:- $25

Have any Question?


Related Questions in Mechanical Engineering

Fluid mechanics assignment - finite control volume analysis

Fluid Mechanics Assignment - Finite Control Volume Analysis and Dimensional Analysis Q1. The wind blows through a 7ft × 10ft garage door opening with a speed of 5 ft/s as shown in the figure. Determine the average speed, ...

Expansion processes of a perfect gasassignment1 attend the

Expansion Processes of a Perfect Gas Assignment: 1. Attend the laboratory class and complete the lab tests according to the supervisor's requirement. Students will not allowed to submit their report if they do not come t ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Life cycle assessmentfor your chosen service eg white board

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Problem on shaft -assuming no frictional losses a torque of

Problem on Shaft - Assuming no frictional losses, a torque of T = 750lb·in is applied through the shaft of gear F in order to drive the roller chain at point B at a constant speed. The chain sprocket has a pitch diameter ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Alocate ten minutes for the presentationuse audio visual

Allocate ten minutes for the presentation Use audio / visual / technological supports / aids where appropriate Use a minimum of 3 properly referenced articles. THEMES PRESENTATION TOPIC MEMORY Discuss the three learning ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As