1. For a 77t truck with Gross Vehicle Weight (GVW) of 136078 kg with dual rear tyres and a tyre inflation pressure is 120 psi (or 8.43 kg/cm2). Use the equivalent single tyre loading.

i. Determine the contact surface area
ii. If the sub-grade material is a firm or stiff clay, then determine the minimum required distance between the wearing surface and the top of the sub-grade.

iii. With the same truck specifications, design an acceptable haul road (ie determine different thicknesses of different layers) using CBR method.

228_Rock-testing techniques.png

Choose your own material for different layers with proper justifications.

2.  a.  A pit with a straight ramp of 800m, with a gradient of 10%, supplies a ROM pad 1500m away via a level haul road all of loose gravel. Mining of a dipping ore body, with a specific weight of 2.5 t/m3, is required to be carried out at a rate of 10,000 tonnes/8 hour shift to feed the mill.

Since truck speed is restricted to 50kmph, assume the average speed of a truck during a round trip is 45kmph, including reversing to load.

Waste material of specific weight = 1.85 t/m3 is also to be mined, and deposited on a waste dump 200m from the pit. The waste dump already has a height of 10m, and an area of 100m x 60m from pre-stripped overburden. Excluding the overburden, the strip ratio is 1:4.5. 
Other factors that are working assumptions are:

Availability of excavator 83%,
Swell factor of 30%
Bucket fill factor of 88%
Excavator cycle time 45 seconds
Rolling Resistance Factor (RRF) = 15 kg/t
Coefficient of Friction, µ = 0.25
Grade Resistance Factor = 20 kg/t
 
(i) Calculate required output by a single excavator appropriate to this production and select an appropriate machine.
(ii) Calculate cycle times for trucks.
(iii) Calculate number and size of trucks.
(iv) Ensure trucks are capable of carrying out this mining safely.

3.  Working Bench

Consider a mining sequence on a working bench.

a.  Define the width of a working bench with a neat sketch.
b.  Design a working bench when a single shovel of 6.8m3 capacity details of

which are supplied in the notes with single spotting is used:

  Given:
i.  design bench height =15m
ii.  shovel will move along one line parallel to the bench face
iii.  bench face angle 65°
iv.  parallel cut will be used with turn and back
v.  single spotting
vi.  haulage by 50 tonne capacity truck
vii.  truck width = 5.5m
viii.  truck tyre rolling radius = 1.2 m
ix.  a safety berm is required

4.  Pit Slope Angles.

Define, with a neat sketch, the different types of slope angles in a surface mine
Given:
-  No. of benches = 9
-  Bench face angle =69°
-  Safety bench width = 10m
Based on the above data determine the following:
1.  the overall slope angle
2.  the overall slope angle if you introduce a ramp of 27 m width on the 5th bench
3.  the inter-ramp angles 
4.  on the initial design, the overall slope angle if you introduce a working bench only on the 2nd bench

Various rock-testing techniques are employed in rock mechanics. Students are to select a particular parameter that is useful in assigning a value to a particular variable employed in rock mechanics (e.g. shear strength, UCS etc) and to describe suitable techniques of evaluating this parameter. This is a research report and all sources used should be cited and referenced in an appropriate manner. The results should be presented in the form of a technical report and illustrated as appropriate. In particular students should present the methodology of testing as well as any flaws in the testing method.

Estimate the machines production under these conditions using the travel time curves given in the Caterpillar Performance handbook.

Attachment:- questions.pdf

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9687265

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As