Ask Civil Engineering Expert

Electrostatic precipitators (ESPs) are used to clean particles from gas flows such as the exhaust from a power plant boiler or a municipal waste incin-erator. They work by applying a charge to the particles, which then move at their terminal velocity in 'response to the electrostatic force that results from an applied voltage. In this problem, you are to do the following (con-ditions and equations that apply to the entire problem are given at the end of the problem):

(a) To Calculate the terminal velocity, it is first necessary to clearly identify the forces acting on the particle. Draw a picture similar to that in Figure 4-16 and identify the forces acting on a particle passing through the ESP. Note: Neglect gravity in this calculation-assume that the only external force acting on the particle is the electrostatic force. Since buoyancy is a result of the gravitational force, neglect buoyancy also.

(b) Calculate the terminal drift velocity (w) of particles in response to the electrostatic force as a function of particle diameter. Report your so-lution as an equation that gives the w in units of cm/s, and specify the units of Dp that you are using.

(c) Calculate the terminal drive velocity for particles of the following di-ameters: 0.5 gm and 10.0 µm.

(d) For comparison, calculate the gravitational settling velocity for the same particle sizes.

(e) By comparing your answer for part (a) to the Stokes ; settling velocity equation, determine the particle size for which the gravitational settling velocity is equal to the drift velocity in the ESP. Express your answer in units of µm.

233_1f560058-8d6a-4541-81f9-594ec9e2fca3.png

837_ef36c829-7b50-4ff9-8d3b-069cb162f7b1.png

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92005500

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As