Duncan Hanes is considered one of the best design engineers for XYZ Corporation. His expertise lies in the area of heating and air conditioning controls. These controls are used to regulate the temperature to customers' desired settings throughout commercial buildings such as office buildings and manufacturing buildings. The controls consist of temperature sensors as well as the manual regulators for different areas of buildings. Whenever there is a new construction of renovation of the building each control system must be individually designed for that particular application.

After spending so much in design and gaining experience, Duncan was selected to be a project manager for a new project company just received. The project requires installing these controls while the building is under construction. The construction company is known for running aggressive schedule. The building will include office space, work space, manufacturing facility, and storage facility both for mechanical equipment and for electronic equipment. A team of nine people has been assembled by higher administration for Duncan to work with. Since controls are installed during the construction of the building, Duncan's team has to work closely with the construction company to ensure his team is available and is working at the right location at the right time.

Duncan accepts the challenge to manage the team of nine people. The team members come from diverse background in terms of age, gender, technical knowledge, and degree of experience.

During the first meeting, Duncan introduces everyone and instructs them to develop their work schedule around Construction Company's work schedule. He tells them that it is a routine work and we just do our installation and get out of the way of Construction Company. All the components for control system are ready to go and they are being stored in nearby warehouse. Since work will start in two weeks, team has enough time to review and plan for the installation of the control system. Duncan formed three groups by selecting group members based on their perceived skills and experience. At the end of the first week Duncan noticed that work is not progressing as planned. One of the group has been at the same location where construction crew was working. The Construction Company boss changed his schedule without informing Duncan. Harsh words were traded between Duncan and Construction Company's boss. Two weeks later even more problems were surfacing. Older team members did not like to work with younger team members. Older team members thought that younger members should do more work to gain experience while younger members thought older members should do more work since they are experienced and efficient. There was lots of discussion on coordination of the work. Some team members will come early while others will come late so it was difficult to stick to the work schedule.

Over the weekend Duncan start analyzing the situation. This was a routine work and should have been done without any problem. His experience as a design engineer taught him that things should go smoothly science it is not a rocket science. Duncan has provided all team members with complete instructions and technical specifications but work was falling behind and he has no idea what has gone wrong. You need to help Duncan to identify problems by performing the following:

1. List as many possible errors as you can find that Duncan has committed in forming the team and comment on the proper action needed.
2. What are some of the possible errors committed by the team members and what should have been done?
3. What can be done from the end point where Duncan realizes that the project is not progressing as planned?
4. Identify any XYZ organizational weaknesses that may have contributed to the situation.
5. Analyze the situation based on the material learned in the class to what applies correctly and what does not apply correctly.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91008637

Have any Question?


Related Questions in Mechanical Engineering

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As