Drainage Design Assignment

The main access to a large rural farming community in a developing country is provided by an engineered earth road. However this is often subjected to flooding and impassability which prevents access during several months of the year, making the community vulnerable and isolated. Costs of significant agricultural production in the area are also correspondingly affected. As a result the government is set to upgrade the road to an all season road.

Your organisation has been invited to undertake studies to determine a suitable drainage scheme for the new road. You are also required to provide an indication of the new road's geometrical design and some calculations associated with a suitable pavement structural design.

Available Data

The information provided to you is of low quality, and so will need to state clearly any assumptions you make.

1. The existing road is an engineered earth road

2. The new all season road is expected to carry 1.5 million standard axles over its design life (10 years).

3. Possible horizontal alignments are shown on logographical maps (Figure 1 and Figure 2). Select one of these or provide justification for an alternative.

4. The horizontal curve is 1500 metres in radius with a 3% crossfall

5. Topographic maps (of low quality) shown in Figure 1 and Figure 2

6. The nature of the surface soils is silty clay with light natural vegetation covering. Any imported material will be sandy clay. Subgrade CBR's are 12% and 18% respectively un-soaked and 4% and 8% soaked.

7. The road surface is to receive a thin bituminous surface overlying a base and sub-base, characteristics of which are to be recommended by this study.

8. The sealed pavement width is 7.4 metres plus two 1.8 metre unsealed shoulders which comprise of crushed stone.

9. Run off and stream flow is as follows:

  • Run off from the verge - calculate using the shown catchment areas
  • Run off from the road - calculate using 'i' of 75 mm/hr for 1 in 5 year and 95 mm/hr for 1 in 10.
  • Stream flow at chain age 240 metres - 8 m3/sec (1 in 10 yr flow)
  • Stream flow at chain age 390 metres - 23 m3/sec (1 in 10 yr flow)
  • 5 m3/sec dry season flow.

10. When determining the coefficients of run off for the various surfaces you need to bear in mind that although future land use for the catchment area are undecided, housing development in the vicinity of the new alignment should be considered.

1616_Figure.png

469_Figure1.png

Design Steps

i) Choose a vertical alignment for your horizontal alignment so that it contains some cutting and some fill sections tying into the existing grades at the ends of the project (given in some cases). A flood crossing is to be considered for the crossing at 390 metres.

ii) Provide a pavement design solution. You may use an analytical design approach or utilize (with appropriate justification) existing empirically founded catalogue methods.

iii) Establish typical cross sections of the road for cuts, fills and culvert/flood crossings. Indicate cross falls, side slopes, back slopes and any necessary drain facilities. The position and direction of the longitudinal drainage can be shown schematically on a plan for run off determination. Off road catchments for local drainage are to be calculated. The initial designs can be changed or modified later after more detailed design. Assume that the slopes will be resistant to slip but not necessarily surface erosion.

832_Figure2.png

iv) Design hydraulic drainage treatments which have the capacity to cater for each of these discharges. Apart from a piped system for the village and the culvert or flood crossing, you have options in the type of drainage facility that can be provided, e.g. open or closed side drains, kerbed or un-kerbed paved carriageway.

v) Velocity of flow and rainfall impact may also be an important design parameter. Make appropriate checks. Protection works may be needed, e.g. at the outlet to the culvert.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92197462
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As