Design Brief

MAJOR DESIGN ASSIGNMENT

696_Floor plan of building frame.jpg

Figure 1: Floor plan of building frame

Design Brief

Figure 1 represents the floor plan of an office building to be constructed in the Central Business District of Sydney. The building is to be eight storeys in height with each level being used as an office and with one levels of car park below the street level. Your team is assigned to design all the columns below both the level 1 and the street level, the floor slab, the primary and secondary beams including a transfer beam so that one column is terminated at the level above the street as shown in Figure 2.

669_Floor plan of building frame1.jpg

Figure 2: Elevation of building frame

Typical floor to floor height = 4 m

Design Information and Requirements

- Beam concrete compressive strength, f'c = 32 MPa (You are allowed to increase f'c if needed)
- Reinforcing steel strength, fy = 500 MPa (Use N Class bar)
- Slab live load = 3.0 kPa (Imposed load)
- Superimposed dead load = 1.0 kPa (Provision for partitions)
- Concrete density = 24 kN/m3
- Columns are 500 mm x 500 mm
- Beam widths are fixed at 500 mm
- Maximum beam depths should not exceed 1000 mm
- Slab depth is 200 mm
- Reinforced concrete service core is 500 mm in wall thickness
- Concrete slabs are supposed to be built monolithically with the supporting beams therefore the beams have to be designed as L or T-beams
- All the outer beams have to be designed as continuous beams
- All the calculations have to be presented in the report
- Report submitted has to be the original copy (No scanned copy allowed)

Part 1: Load Combinations:

a) Determine the load combinations for the permanent, imposed and superimposed loads using AS/NZS 1170.0 and 1170.1 (2002).

b) Determine the required design actions such as M*, V* and N* for slab, column and beam designs for both serviceability and strength limit states.

c) Provide the required bending moment, shear and axial force diagrams for the beams, slabs and columns using the software package such as Microstran or other forms of calculation.

Please take notes that wind loads will be resisted by the service and lift core of the structure which is subcontracted out. (Not required to design by your team)

Part 2: Analysis and Design:

Design all the required members such as the floor slabs, columns and beams and provide adequate drawings or sketches showing elevations and cross-sections for the each members.

a) Floor slabs

b) Columns

c) Primary and secondary beams

d) Detailing, report presentation and group management

Additional Information

All design and detailing is to be in accordance with AS 3600 (2009).
All loads are to be determined using AS/NZS 1170.0 and 1170.1 (2002).

Presentation of the Assignment

It should be legible and logically arranged. A typical presentation would contain, in order: a title page including names of structural engineers involved in the design, detailing of structural elements in applicable sections, supporting calculations in each section, and appendices containing any appropriate technical information.

Typing is not required or necessary but neatness and clear presentation is important. All material should be securely bound into an A4 sized booklet. Where A3 sized drawings have been used, they should be folded down to A4 size with appropriate title blocks in the bottom right hand corners facing up.

You are required to prepare and submit a group assignment showing independence in design. Your submitted design should contain no evidence of copying as this is against University Rules relating to Academic Misconduct.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92252742
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As