1.design a bar screen for a peak average flow of 0.46m3/s.you can consider reasonable assumptions.
2.design an aerated grit chamber installation for a peak flow rate of 1m3/s.if the earation rate is 0.4m3/min.per meter of tank length,determine the total air required.