Communication amongst agents plays an essential role in the Holonic manufacturing system. Exchange of information via communication among agents may decrease complexity and uncertainty. The information can generally be classified into two categories. These are procured information and supplied information. The supplied information mentions the data that can be retried from the blackboard or from databases. Alternatively, the procured items are acquired only while an action is initiated via the agents for procuring such information. The given four types of events may be related with an agent (Let Agent A), in the information based manufacturing paradigm:

  • Agent A inquires for (request) information firm other agents.
  • Other agents request information from agent A.
  • Agent A takes part in group discussion with other agents.
  • Information is broadcast either via or to agent A.

These four types of event can be tackled via fundamental communication. "Tell and Request" are the two merely communications for inter-agent communication, in Holonic manufacturing system. Based on these two categories of aforementioned  and communication four  events,  protocols  are  generally  classified  in  to  four  primary types. The details are specified in Table no.1.

                                                                      Table no.1: Protocols and Their Significance              

Protocol Name and Referencial Mode Number

Types                         of

Communication

Significance

Tell (mode 1)

Determines,            sets, controls etc.,

Mandatory

Negotiate (mode 2)

Discussion, brainstorming  sessions, negotiations, etc.

Negotiable

Request (mode 3)

Inquiries, invokes etc.

Can   be   asked   for

(Retrieval)

Disseminate (mode 4)

Proposal, guidance, etc.

Provided  voluntarily

(Broadcastable)

 

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M9525984

Have any Question?


Related Questions in Mechanical Engineering

Expansion processes of a perfect gasassignment1 attend the

Expansion Processes of a Perfect Gas Assignment: 1. Attend the laboratory class and complete the lab tests according to the supervisor's requirement. Students will not allowed to submit their report if they do not come t ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Alocate ten minutes for the presentationuse audio visual

Allocate ten minutes for the presentation Use audio / visual / technological supports / aids where appropriate Use a minimum of 3 properly referenced articles. THEMES PRESENTATION TOPIC MEMORY Discuss the three learning ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

1 explain the term critical equipment and provide two clear

1. Explain the term "critical equipment" and provide two clear examples of machinery which falls into this category on board a twin screw motor vessel. 2. Explain the process of Charpy lmpact Testing including sample mar ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Structural mechanics questions -q1 a 150-lb bucket is

Structural Mechanics Questions - Q1. A 150-lb bucket is suspended from a cable on the wooden frame. Determine the resultant internal loadings on the cross section at D, and at E. Q2. The shaft is supported at its ends by ...

Problem on shaft -assuming no frictional losses a torque of

Problem on Shaft - Assuming no frictional losses, a torque of T = 750lb·in is applied through the shaft of gear F in order to drive the roller chain at point B at a constant speed. The chain sprocket has a pitch diameter ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As