COLE/LAKE HAZEL INTERSECTION PROJECT
Ada County, Idaho

PROJECT DESCRIPTION

The intersection of Cole/Lake Hazel, located in south Boise, is currently a three-legged intersection with a future fourth leg proposed to the east. Lake Hazel Rd. is a major arterial roadway across south Ada County and long term will extend east eventually tying into the Eisenman interchange near Micron. Cole Rd. is a residential collector (two lanes) without sidewalks or bike lanes. It extends to the south, but ends at a rural lot subdivision about two miles south of Lake Hazel.

GOALS/OBJECTIVES:

- Design an intersection that will better accommodate all users, including pedestrians, bicycles, transit users and motor vehicles for forecasted traffic volumes twenty or more years into the future.

- Design a cross section of Lake Hazel to the east that will accommodate future traffic demand in addition to pedestrian and bicycle traffic.

- Minimize the impact to adjacent property for any design alternative considered.

- Consider a public involvement campaign and how you would go about creating one for any "unconventional" intersection design treatment.

THINGS TO CONSIDER

- Traffic volumes: morning, afternoon, and evening

- Traffic patterns - Cole to the south of the intersection has relatively little traffic today, but there is significant potential for development in the near future with nearly 2000 homes planned on the east side of the intersection. Lake Hazel connected Cole to the west just recently (within the last two years), which helps to alleviate vehicles cutting through the neighborhood to the north.

- Pedestrian and bicycle accommodations on all legs of the intersection.

- ACHD considered unconventional intersection alternatives (Continuous Flow Intersection, Michigan U-turns, flyovers) that may not be well known to Ada County drivers. These may be possibilities in designing your intersection, but how do you communicate this information to the public? What strategies will you use and how will you justify doing so based on your engineering analysis?

RECCOMMENDED ELECTIVE COURSES
The following is a list of recommended elective courses that will be useful in completing the required design elements:
- CE 440 Pavement Design
- CE 470 Highway Systems Design
- CE 472 Transportation Planning
- CE 475 Traffic Systems Design

COMMUNICATION
Questions and requests for additional information must be directed through the faculty advisor assigned to this project. Please refrain from contacting any outside officials, unless instructed otherwise.

Attachment:- Cole and Lake Hazel Design.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92718681
  • Price:- $150

Guranteed 48 Hours Delivery, In Price:- $150

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year