Scenario:

This is a real case project: Client is considering building a four story dual usage flats suitable for both residential and office usage to replace an existing two story building. Therefore in the first place existing building should be demolished. Total available land is 106.91 m2. Local council allows 70% of the land to undergo construction for each level. Maximum four story building is permitted in this area and indoor parking should be provided for each flat. In other words if you cannot provide a parking you have to reduce the number of stories.

Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas. In commercial sense, waste area will be staircase and space taken by elevators as client cannot charge for these areas.

Figure shows indicative ex of Architectural plan for one floor.

Additional information:

A) Parking should be considered in the ground floor, clear height of the ground floor should be 2.5m.

B) Clear height in each level apart from the ground floor should be 3.0 m.

C) You need to provide demolition strategy as another building is attached to this building along the longer length of the land 17.80m.

D) Flat roof should be considered for this structure and you need to think innovatively to use the roof space for service units e.g. A/C.

E) It will be a consultant choice to use steel or concrete structure however you have to convince the client with supportive argument e.g. space.

F) The design has to fully consider the implication of planning permission.

As consultant you should provide overall material cost for this project.

You will work on this project as a team of two or individual where Cost analysis, Economic evaluation, Drawing, Structural analysis and design, Presentation and Final report will be shared equally.

Part one:

Presentation: Design Briefing, CAD Drawing, Outline Design

Group/ individual will carry out the following tasks:

1) To conduct the client’s requirement to capture and produce a design briefing to target on the client’s requirements.

2) To produce drawing plans and development plan with sketches or CAD drawings. The plans have also to present the solutions to the issues identified in feasibility study.

3) Specifying Structural Column plan for each level.

4) Specifying beam plan for each level.

5) To produce several options of outline/conceptual design to target on the client’s requirements and some factors of the site situation, which have to be consistent to the general spatial arrangement suggested in the Metric Handbook and other references.

6) To choose a final version of the design and produce a set of proper CAD drawings for this design including floor plans and elevations.

7) To integrate the work from each member of the team and prepare your group/individual presentation to demonstrate your design brief, feasibility study and final drawing .

Part two
:

Report and presentation: Structural analysis and Design, Cost analysis

1) Improve your outline design and ensure the design is compliant with the Building Regulations, and clarify the essential solutions in terms of structure, building services and building sustainability

2) The students have to produce a structural calculation and design for the major structural elements of the building with proper consideration and analysis of various loads based on the architectural design and the building functions.

3) Each group/individual integrates their work and prepares for a second presentation, which should reflect the integration of the project and individual contributions to the project .

4) Each group/individual has to submit the final report which includes, drawing cost analysis and structural calculation. Report should not exceed 3000 words including the part one. Final report should include and update the part one too. The report has to follow academic writing format with proper references in Harvard format.

1502_indicative architectural plan.jpg

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9652

Have any Question? 


Related Questions in Civil Engineering

Consider the prototype patterns shown to the lefti are

Consider the prototype patterns shown to the left. i. Are these patterns orthogonal? ii. Design an autoassociator for these patterns. Use the Hebb rule. iii. What response does the network give to the test input pattern, ...

A short one-side closed cylindrical tube is used as a

A short, one-side closed cylindrical tube is used as a surface-radiation source, as shown in Figure Pr. 4.17. The surface (including the cylindrical tube and the circular closed end) is ideally insulated on its outside s ...

A pitot tube uses a manometer readout with a fluid having a

A Pitot tube uses a manometer readout with a fluid having a specific gravity of 0.82. The tube is oriented parallel to an airstream at 1 atm, 25?C, having a velocity of 30 m/s. The accuracy of the dynamic pressure measur ...

Repeat the work of widrow and hoff on a pattern recognition

Repeat the work of Widrow and Hoff on a pattern recognition problem from their classic 1960 paper [WiHo60]. They wanted to design a recognition system that would classify the six patterns shown in Figure P10.11. These pa ...

Suppose you are shown this circuitwithout any analysis-just

Suppose you are shown this circuit: Without any analysis-just by looking at the circuit-you should be able to tell whether it does or does not have a hazard. Explain how you can do this and indicate whether or not this c ...

Te forces p and q act on the handles of the wrench if p

The forces P and Q act on the handles of the wrench. If P = 32 lb and Q = 36 lb, determine the combined moment of the two forces about the z-axis.

1 is it possible for a one-input one-output combinational

1. Is it possible for a one-input, one-output combinational circuit built entirely of two-input NAND gates to contain a hazard? Either draw such a circuit or explain why one cannot be built. 2. Is it possible for a Combi ...

Consider a single-input neuron with a bias we would like

Consider a single-input neuron with a bias. We would like the output to be -1 for inputs less than 3 and +1 for inputs greater than or equal to 3. i. What kind of a transfer function is required? ii. What bias would you ...

Consider again the four-class decision problem that we

Consider again the four-class decision problem that we introduced in Problem P4.3. Train a perceptron network to solve this problem using the perceptron learning rule. Problem P4.3 We have a classification problem with f ...

Repeat exercise e71 using the pseudoinverse ruleexercise

Repeat Exercise E7.1 using the pseudoinverse rule. Exercise E7.1 Consider the prototype patterns given to the left. i. Are p 1 and P 2 orthogonal? ii. Use the Hebb rule to design an autoassociator network for these patte ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

WalMart Identification of theory and critical discussion

Drawing on the prescribed text and/or relevant academic literature, produce a paper which discusses the nature of group

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro