Ask Civil Engineering Expert

Building Information Modelling

During the delivery of this coursework students will gain an understanding of the importance of sharing project knowledge at an early stage of programme. It is also intended that students will adopt a robust methodology to the structuring and classification of information and asset data.

Students will create a simple federated BIM model of a Pedestrian footbridge for the Campus as indicated in Appendix A. This is for the primary purpose of delivering BIM asset information to the project team at Project Concept Stage. Please use the individual dimensions in Appendix B for the typical cross section.

Models must be created in metres and co-ordinated to a common, clearly de-fined and labelled grid system. Datums will be in metres. All 3D models will be at a true world scale i.e. 1:1.

To limit work load and reduce complexity this model is clearly identified as being required for concept design to enable the design team to commence preliminary de-sign work. It will therefore require a Low level of detail (LoD) and Low level of Infor-mation (LoI)

All models must adhere to the following guidelines:-

1. Use BS1192:2007 Layers organised by engineering discipline

2. Adopt Uniclass 2015 to classify their internal block names and model names

3. The project number can be your student identification number.

Students will use Autocad to create their models.

The federated model will comprise of three discipline models from the following engineering disciplines:-

1. Structural e.g. Footbridge Foundations

2. Fabricated Steelwork

3. Bridge Deckings and any additional handrailing or furniture

Asset data could compromise details such as dimension size, material, role/owner, maintenance requirements etc.

Marks will be allocated as follows:

1. Modelling

2. Grid system

3. Layering

4. Classification

5. Asset data transfer

Students will submit two A3 sheets

Sheet (a) will contain the drawing of their federated model. It does not need to be printed to scale. However the model should be clearly illustrated together with the co-ordinating grid system. Please note that this model is often referred to as a PIM (project information model)

Sheet (b) will contain 3 tables documenting a summary of the layering, classification and asset data. The asset data will be a snapshot from their excel database. Please note that the asset model is often referred to as the Asset Information Model (AIM)

Each of the three models must be clearly labelled, including the structured nam-ing classification.

The simple title block should clearly indicate the students and identification number.

Please note that students should choose a simple engineering model as a basis to illustrate their understanding of how BIM can support the collaboration and sharing of data.

For supporting information, please refer to: BS1192:2007 (this offers specific guidance on layer naming and model co-ordination)
PAS1192 part 2 for BIM concepts

NBS website for Uniclass 2015 (this offers specific guidance on the correct naming and classification of discipline models)

Class notes and Comprehensive Autocad online help system for Autocad 3d solid modelling, block creation, attribute creation and attribute extraction.

Autocad commands that may prove useful include:

1. Extrude - to extrude a 3D solid from a closed polyline

2. Union - to join two solids

3. Vport - to create different views of the simple model

4. Attdef - to create an attribute

5. Block - to create a block

6. Ddatte - to fill in a blocks value

7. Use the data extraction command within Autocad to filter and extract selected block and attribute value. This will enable the development of your Asset information model/database in Excel

Appendix A - Typical Section through Pedestrian Footbridge

1092_Typical Section through Pedestrian Footbridge.png

APPENDIX B: Section Line location

First Letter of Your Surname

First Letter of Your Forename

Please take the section dimensions as follows:

 

 

Dimension A

Dimension B

A-H

A-H

1.3 Metres

1.2 Metres

A-H

I-Z

1.4 Metres

1.3 Metres

I-N

A-H

1.3 Metres

1.4 Metres

I-N

I-Z

1.4 Metres

1.2 Metres

O-Z

A-H

1.3 Metres

1.3 Metres

O-Z

I-Z

1.4 Metres

1.4 Metres

Snapshot from Ordnance Survey Tile TQ0682.dwg (supplied)

Attachment:- Building information modeling.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91616739
  • Price:- $80

Guranteed 48 Hours Delivery, In Price:- $80

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As