Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Mechanical Engineering Expert

At Rockland Steel, we make steel coils that are ultimately used to form many common consumer products. One of our production facilities is a hot strip mill that turns steel slabs into coils of steel.

Operation Details

Production

The facility produces coils one at a time. A coil can be of varying weight according to the following distribution:

Coil Size                                      % of Coils            Rolling Mill Time    

Small (100-200 pounds)                        50                         5 minutes

Medium (200-500 pounds)                     30                        10 minutes

Large (500 and above pounds)              20                         22 minutes

A coil looks similar to a very large roll of toilet paper. A slab can produce one large coil, two medium coils or four small coils. An individual slab cannot be used to make multiple types of coils. (Hint: your Decide module will contain these percentages: 24.5% small, 34.5% medium, 41% large to achieve desired distribution of coils.)

Hot Strip Mill (HSM)

A hot steel slab is run through a sequence of rolling mills to reduce it to a long, thin strip of a given width and thickness. Slabs arrive according to an Exponential distribution with a mean of 20 minutes apart. (All slabs are the same size.) The strip is fed into one coiler at the end of the mill where the coil is formed. The coils are then removed by automated equipment and banded and placed in a common staging area. You can assume that the time to band and place the coils is included in the times given above.

After banding, the coil is staged for pickup/movement to the shipping dock. If it is a small or medium coil it is placed on a conveyor. If large, it must be moved by forklift. It is a type of non-accumulating conveyor that automatically transfers the coils forward toward the delivery end. Both small and medium coils can be assumed to take the same amount of space on the conveyor (15 feet). Each large coil must be transported by forklift(s) which runs at 30 feet per minute. The distance to be covered from the mill to the shipping area is 400 feet for the forklift and 300 feet for the conveyor.

The hot strip mill works continuously 24 hours per day, 7 days per week. Run your simulations for seven days.

Adjust the speed of the conveyor and the number of forklifts needed for this operation. This may affect your output number of coils for each size. Be sure to produce the right mix or coils for sale given in the table above. Discuss the impact of conveyor speed and number of forklifts for your best model. Make sure that your model shows conveyor and forklift animation. Put counters on the screen for coiler queue, conveyor queue, forklift queue and shipped count by coil size. Utilization of forklifts is desired to be as high as possible.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91007796

Have any Question?


Related Questions in Mechanical Engineering

Alocate ten minutes for the presentationuse audio visual

Allocate ten minutes for the presentation Use audio / visual / technological supports / aids where appropriate Use a minimum of 3 properly referenced articles. THEMES PRESENTATION TOPIC MEMORY Discuss the three learning ...

Problem on shaft -assuming no frictional losses a torque of

Problem on Shaft - Assuming no frictional losses, a torque of T = 750lb·in is applied through the shaft of gear F in order to drive the roller chain at point B at a constant speed. The chain sprocket has a pitch diameter ...

Fluid mechanics assignment - finite control volume analysis

Fluid Mechanics Assignment - Finite Control Volume Analysis and Dimensional Analysis Q1. The wind blows through a 7ft × 10ft garage door opening with a speed of 5 ft/s as shown in the figure. Determine the average speed, ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Fluid mechanics assignment - viscous flow in pipesq1 as

Fluid Mechanics Assignment - Viscous Flow in Pipes Q1. As shown in the figure below, water "bubbles up" 3 in. above the exit of the vertical pipe attached to three horizontal pipe segments. The total length of the 0.75-i ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Structural mechanics questions -q1 a 150-lb bucket is

Structural Mechanics Questions - Q1. A 150-lb bucket is suspended from a cable on the wooden frame. Determine the resultant internal loadings on the cross section at D, and at E. Q2. The shaft is supported at its ends by ...

Expansion processes of a perfect gasassignment1 attend the

Expansion Processes of a Perfect Gas Assignment: 1. Attend the laboratory class and complete the lab tests according to the supervisor's requirement. Students will not allowed to submit their report if they do not come t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As