Read the incident scenario, and write a response that is at least three pages in length. Your response must include answers to the questions being asked. All sources used, including the textbook, must be referenced. Paraphrased and/or quoted materials must have accompanying in-text and reference citations in APA format.

Scenario:

You are the Refinery Emergency Response Coordinator for an incident at the SJV Refinery which has been in operation since 1966. The refinery processes 120,000 bbls of crude oil per day, which has a sulfur content of 2.5 percent. The refinery converts crude oil to naptha, light oil, and heavy oils using the Atmospheric/Vacuum Distillation Unit with key equipment such as the following:

• naptha, kerosene, gasoline, and diesel hydrotreaters;
• isomerization unit;
• naptha reformer;
• fluid catalytic cracker;
• coker;
• hydrocracker;
• polymerization unit (petrochemical section of the refinery polymerizing olefin gases to produce polyethylene);
• sulfur recovery Claus plant (catalytic reactors); and
• distillate/gasoline blending tanks.

The refinery was initiating work on a major plant turnaround at the time of the incident to complete required maintenance repairs, mechanical integrity inspections, and modifications to existing equipment. Twenty contractor companies (approximately 150 employees) have been contracted to perform this work under the direction of refinery staff. All of the contractor workers completed the refinery orientation training.

Work for the contractor crews is assigned/scheduled each morning. On the day of the incident, the day-shift (6 am to 6 pm) crew had been tasked with isolating the acid gas feed stream for the Claus unit. Due to other work priorities, the crew did not isolate the line as planned. A shift turnover for the night contractor crew did not happen due to mandatory safety training that delayed their arrival at the worksite. Upon their arrival at the work site, the night crew held a job safety analysis (JSA) review of the scheduled task (line breaking of the acid gas feed line to replace a segment) to be performed and the hazards present. No pressure gauges or monitoring was present to indicate that the acid gas feed line was operational. The crew initiated the line breaking activity (open the line to the atmosphere) at approximately 7:45 pm under self-contained breathing apparatus (SCBA), which almost immediately resulted in the uncontrolled release of acid gas. A nearby ignition source from a welding operation ignited the flammable gas. The following actions were initially taken:

• The evacuation alarm was sounded and the refinery emergency response team (ERT) was activated.
• The plant manager and the local fire department were notified of the incident.
• The incident command was established at the refinery office near the main refinery access gate to the south (this is the furthest distance within the refinery boundary from the incident location).
• The refinery ERT incident commander implemented actions required under the approved refinery emergency response plan.
• The ERT was not able to immediately isolate the acid gas feed pipeline.
• The fire department arrived on location and assumed the incident command of the event.

Additional Relevant Information:

• The refinery encompasses an area measuring 2000 feet by 1400 feet. The Claus unit is located in the most northern part of the refinery, approximately 1350 feet from the main refinery access gate to the south. The polymerization unit is operating directly adjacent to the Claus unit.

• The nearest residential community is located approximately 1000 feet to the northeast of the refinery.

• A plastic recycling plant is located along the south fence boundary of the refinery.

• A major interstate highway runs directly parallel to the plant, approximately 1/4 of a mile directly north of the refinery.

• The ambient temperature on the day of the incident was 85° F and the wind was blowing at 7 mph from the southwest to the northeast.

• Work crews were scheduled to work 12-hour shifts, 24-hours a day, to complete the refinery turnaround.

• Due to the age of the refinery, SJV has implemented a robust mechanical integrity program.

• The refinery has a trained ERT that can respond to incidents.

• Fixed water monitors are present throughout the refinery to extinguish refinery equipment fires. The refinery ERT does not fight fires past the incipient stage.

• The refinery has received notices of violation (NOVs) from the local air district in the past several years due to gas and liquid leaks from piping components, such as valves, compressor/pump seals, and for excess sodium dioxide (SO2) emissions related with their sulfur plant.

• Due to historical discharges of organic compounds, groundwater monitoring wells are present down gradient of the facility. Groundwater underlying the plant has historically been encountered at 30 feet below ground surface.

• Hydrogen sulfide is present in the acid gas feed to the Claus plant. The H2S concentration of the acid gas feed is approximately 70 percent by volume. H2S and sulfur dioxide (SO2) have the following physical properties:

Physical Property 

H2S

SO2

Specific Gravity at 68oF (20oC)

1.54

1.4

Vapor Density (Air=1)

1.18

2.22

Flashpoint

-116oF (-82.4oC)

Not Applicable

Autoignition Point

500oF (260oC)

Not Applicable

Lower Explosive Limit

4.3%

Not Applicable

Upper Explosive Limit

46%

Not Applicable

IDLH

100 ppm

100 ppm

Questions:

1. Discuss the hazards posed by the interaction of the hazardous materials present at the refinery and adjacent facilities, including the resulting by-products of the incident fire and acid gas release.

2. As the lead refinery representative on the unified incident command (UIC), what actions should be taken by the UIC to respond to this incident (please consider all receptors).

3. If the polymerization unit is engulfed in the fire, how will this affect your response?

4. All emergency responders participated in the post-incident critique. What corrective actions should be implemented by the refinery to prevent the reoccurrence of this incident?

Science, Academics

  • Category:- Science
  • Reference No.:- M92176015
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Science

Individual work - personal reflectionreflect on the roles

Individual work - personal reflection Reflect on the roles you performed in this group task and reflect on the ways you impacted on the group. Describe some of the things that you did that were helpful to the group. Desc ...

Rationalesafety and risk management are critical aspects of

Rationale Safety and Risk Management are critical aspects of a workplace and breaches are punishable under Work Health and Safety Law. This task encourages students to analyse and conceptualise responses to safety breach ...

Physiology signature assignment -for your signature

Physiology: Signature Assignment - For your signature assignment, compose a 3- to 4-page case analysis (in addition to a title, abstract, and a reference page) written in APA format with at least 3 references, with one n ...

Course descriptionthis course provides an opportunity for

Course Description This course provides an opportunity for nursing students to enhance their knowledge of historical and contemporary issues relevant to Aboriginal and Torres Strait Islander people. This course will expl ...

Quesiton researchers have attempted to devise a method to

Quesiton: Researchers have attempted to devise a method to place a monetary value on ecosystem goods and services (ecosystem capital). They hope that these efforts will make people aware that: ecosystem goods and service ...

As revenue generators nps must be aware of how their work

As revenue generators, NPs must be aware of how their work contributes to the overall revenue of the clinical practice. You see 20 patients per day on average and take call every third weekend. According to Buppert (2011 ...

Rationalesafety and risk management are critical aspects

Rationale Safety and Risk Management are critical aspects of a workplace and breaches are punishable under Work Health and Safety Law. This task encourages students to analyse and conceptualise responses to safety breach ...

Question in a 3 page paper compare and contrast food

Question: In a 3 page paper compare and contrast food insecurity issues in urban environments vs. rural environments. Discuss the role of food security as compared to food justice. The response must be typed, single spac ...

Midterm exam questions -q1 you are asked to evaluate a

Midterm Exam Questions - Q1. You are asked to evaluate a construction/building project in an area corresponding to the sketch map below. The area has mildly hilly topography and thin soil cover. The bedrock in area X is ...

Assignment -in addition to turning in your isite journal

Assignment - In addition to turning in your iSite journal entry as usual, a short paper with emphasis on writing in a scientific format, properly acknowledging resources, and an overview of the process of thermoregulatio ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As