Aim: To design the stormwater drainage system for a retail building and car park.

Design Brief:

The accompanying diagram shows the plan details of a proposed retail building and an adjoining paved car park to be located in Ferntree Gully (37.89°S, 145.30°E) and a profile drawing of the metal roof showing seven box gutters. Each gutter is laid on a slope of 1 in 360 and terminates in a rainwater head with a downpipe that discharges the roof runoff directly to three junction pits. The junction pits convey the roof runoff, via interconnecting pipes, to a SEP labeled Pit 4. The two SEPs labeled 4 and 5 collect surface runoff from the 6.0m wide concrete walkway and paved car park, which is completely surrounded by a concrete kerb and channel. The resulting total runoff from the site is then discharged to an existing junction pit labeled Pit 6 on an existing DN600 RC municipal council stormwater drain. Assume the time of concentration to Pit 1 is 5 minutes.

Determine:

1. The design flow for each box gutter and downpipe based on an ARI of 100 years.

2. Suitable pipe sizes and grades for the car park drainage system based on an ARI of 20 years. Adopt FRC pipes (C=120) with a minimum DN of 225mm and at least 300mm cover. Aim for pipe slopes that minimise excavation where possible but ensure a minimum flow velocity of 0.8 m/s is achievable when running full on the slope adopted. Ensure a minimum pipe cover of 450mm in the road reserve and allow for 75mm obvert drops at each pit. Draw up the longitudinal sections to scale for both pipe runs as the design proceeds. Use the standard pipe sizing tabulation provided and make clear all assumptions made.

Report:

At least the following is to be included in your group report:- Assignment Cover Sheet (signed and dated), title page, brief executive summary, table of contents with sections and page numbers, the project brief, a typical diagram or sketch showing the details of the box gutter-rainwater head-downpipe assembly, all design computations and the drawings of the work including longitudinal sections along the drainage lines from Pit 1 to Pit 6 and Pit 5 to Pit 4. Drawings should be made to scale on A4 or A3 pages and must include a title, a clear border, and have the scale(s) stated. All work is to be performed to a professional standard.

Students to work in groups of three, share the tasks equally, thoroughly check each other's work, and take joint responsibility for all the work submitted.

Example of how to draw up longitudinal sections for drainage lines.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91408760
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As