Assignment: Traffic Analysis

Problem 1: Roundabouts

As part of the transport impact assessment for a proposed residential development off Zinglemann Road at Klemzig, you have been asked to evaluate the performance of a single- lane roundabout under 2018 weekday AM peak hour traffic projections as a possible intersection form to replace an existing stop-controlled cross intersection, which has been found to be inadequate for the proposed conditions. The figure below illustrates the proposed intersection form, turning movements and flow rates.

583_Figure.jpg

Figure 1 Lane allocation and control, turning movement flow rates (veh/h)

Table 1 Roundabout Parameters

The geometric characteristics of the roundabout are listed in the table below.

Criterion

Single-lane roundabout

Approach lanes

1 east and west, 1 north and south

Circulating lanes

1

Circulating lane width

6.5m

Central island diameter

10.5m

Entry lane width

4.3m

Assume that any pedestrians and cyclists (flows not shown) give way to vehicle traffic. Stating any other assumptions you need to make, conduct your roundabout intersection analysis in a spreadsheet table according to the following procedure:

(i) Calculate the conflicting flow rate past each approach to the roundabout;

(ii) Calculate the flow rate on each approach entry lane;

(iii) With the aid of your current EGB272 lecture notes, estimate the follow-on time and critical gap for each approach entry lane;

(iv) Estimate the headway distribution characteristics of the conflicting stream past each approach to the roundabout;

(v) Estimate the theoretical capacity and degree of saturation of each approach entry lane. Compare with the standard roundabout practical degree of saturation of 0.85;

(vi) Estimate the average queuing delay on each approach lane;

(vii) Estimate the maximum (95th percentile) design queue length on each approach lane;

(viii) Comment on the overall operation of the proposed roundabout for the conditions analysed, including the amount of spare capacity to accommodate traffic growth.

Other requirements
- Use a tabulated spreadsheet to complete this problem.
- Numbering of the movements in your response must be the same as those shown here. In your spreadsheet, your movement calculations must be ordered in rows from the lowest to highest movement down the page. For each movement clearly carry your calculations in rows right across the spreadsheet and be consistent with placement of these calculations for all movements.
- In your spreadsheet, your lane calculations must be ordered in rows according to the following convention: S1, E1, N1, W1.
- Use sensible rounding when displaying answers on your spreadsheet (Excel has a displayed rounding tool, while still carrying the values to a high level of significance throughout the calculations). For example, flows in whole veh/h or 0.xxx veh/s, delays to whole s, and queue lengths to the next whole veh.
- Submit clearly labelled your electronic spreadsheet via Turnitin with your hard copy
of your working so that it can be followed.

Problem 2: Signalised Intersections

As part of the transport impact assessment, you also have been asked to evaluate the performance of a signalised intersection at the cross intersection of Zinglemann Road and Old School Road under the 2018 weekday AM peak hour traffic projections shown in the following figure, as a possible replacement. The intersection geometry, movement numbers and flows, and signal phasing arrangement are shown in the following figure and table.

767_Figure1.jpg

Figure Proposed Signalised Intersection Information

The required parameters for the proposed signalised intersection control are given as follows.

Table Signalized Intersection Parameters

Criterion

Value

Environmental class: Old School Rd

A

Environmental class: Zinglemann Rd

B

Grade: Old School Rd

0%

Grade: Zinglemann Rd

-4% (south approach only)

Curve Radii (all approaches)

Nil tight

Pedestrian crossings

Nil

Heavy vehicles

8% (north approach only)

Yellow time

4s

All-red time

2s

Minimum green time

2s

Lost time (all movements)

(assume same as intergreen time)

Optimal Cycle Time k Value

0

Other requirements
- Use a tabulated spreadsheet to complete this Problem.
- Reproduce the following tables for inclusion of your calculations in your spreadsheet.
- Numbering of the movements in your response must be the same as those shown here. In your spreadsheet, your movement calculations must be ordered in rows from the lowest to highest movement down the page. For each movement clearly carry your calculations in rows right across the spreadsheet and be consistent with placement of these calculations for all movements.
- In your spreadsheet, your lane calculations must be ordered in rows according to the following convention: S1, S2...; E1, E2...; N1, N2...; W1, W2...
- Use sensible rounding when displaying answers on your spreadsheet (Excel has a displayed rounding tool, while still carrying the values to a high level of significance throughout the calculations): Display flow rate to three decimal places, probability to three decimal places; degree of saturation to two decimal places; delay to nearest whole second; queue length rounded upwards to nearest whole vehicle.
- Include all your working in your report.

(i) Find the base saturation flow rates for each lane.

(ii) Lane width and gradient factors adjustment.

(iii) Traffic composition factor adjustment.

(iv) Flow ratio calculation.

(v) Critical movement identification and intersection flow ratio.

(vi) Cycle time calculation.

Calculate optimal cycle time, practical cycle time, and cycle time to use.

(vii) Green time allocation.

(viii) Average delay time and level of service.

Attachment:- unsignalised example.xlsx

Attachment:- Template.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92308185
  • Price:- $90

Priced at Now at $90, Verified Solution

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As