Ask Mechanical Engineering Expert

Assignment: Project Motorcycles

You are a project manager for a medium-sized manufacturer of motorcycle cruisers. The engines in motorcycle cruisers, like the ones you manufacture, are usually categorized by size rather than the number of cylinders. In the past, your company has successfully manufactured and marketed the best-selling of these fuel-efficient cruisers that occupy the middleweight class. The rather nebulous middleweight class comprises motorcycles broadly ranging in engine size from 500 cubic centimeters, or cc, to 1000 cc.

Executives at your company are now interested in motorcycles with larger motors and would eventually like to produce motorcycles in the touring class, specifically designed to excel at covering long distances with motors larger than 1100 cc. The proposed target market for these larger motorcycles consists of males between the ages of 35 and 60 in global markets. Price points for the larger motorcycles cover income ranges from $55,000 to $100,000. Management has decided that your company will meet the objectives stated herein within the next five (5) years. During the proposed changeover, the company will continue to manufacture the middleweight cruisers to serve its existing clientele.

Write a six to eight page paper in which you:

1. Select one of the types of project organization that would suit the development of the larger touring class motorcycles. Outline the process steps that your company would take in order to develop the motorcycle. Provide a rationale for the response.

2. Recommend one strategy to the senior executives that the organization might use to balance short- and long-term needs. Specify the crucial resources that you would need as a project manager to run the existing business interests at the same time that the business changes to the production of touring class motorcycles.

3. Suggest the project management leadership style that is most conducive to overseeing the operation of the business growth plan.

4. Recommend at least three risk mitigation strategies to address project plan details that might be forgotten or overlooked. Justify the selection.

5. Use at least three quality references. Note: Wikipedia and other Websites do not quality as academic resources.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91370146
  • Price:- $40

Guranteed 36 Hours Delivery, In Price:- $40

Have any Question?


Related Questions in Mechanical Engineering

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As