ASSIGNMENT BRIEF

Students should work individually. Work that exceeds the word limit by more than 10% of the total will be penalised.

QUESTION 1

Civils measurement has a number of differences to measurement using building codes. Provide a report on the following issues:

a) Provide an explanation of the major differences between civil engineering projects and building projects.

b) In CESMM 3 locational information generally has more emphasis than in building codes of measurement. Comment on why you think this is the case.

c) CESMM 3 "General Principles" 2.5 seems to be a contradiction, on the one hand it requires detail but in conclusion it requires brevity. Comment on this statement and list other CESMM 3 requirements which demand further description and/or itemisation in order to fully define what is required.

QUESTION 2

Project Brief

From the attached drawings nos.CE/2/A, B and C, and specification below, which represent a mooring dolphin in a tidal harbour:

(a) Prepare a taking-off list

(b) Using CESMM 3 take off the following:

Concrete work, formwork, reinforcement, piling and ancillaries.

Specification:
Location - WestHarbour.
MHWS = mean high water spring (tide).
Mooring dolphin head to be in designed mix concrete, mix ST2.- See additional information document.

Only measure a sample of the steel reinforcing rods, namely rods reference D1, and D2 see reinforcement specification on additional information document .

Isolated steel piles to be Round hex Box Piles No.3 section,weighing105.71kg/m,327x 330 mm, girth 112 mm. Each pile to be supplied with a cast steel shoe weighing 80 kg. All raking piles to be set at 1/3 inclination.

Piles to be fabricated and supplied to the following lengths; all vertical piles 16.50 m, raker piles 4 @ 17.00 m and 2 @ 18.50 m.

Outsides of piles, with exception of bottom 2.00 m shall be sand-blasted and painted with two coats of coal tar before pitching. After driving to the required penetration the piles to befilledwithconcretegradeC2,afterconcreteiscuredpilestobecutoffattheindicated level.

Coal tar to be removed from all surfaces in contact with the concrete dolphin head. Two rows of 25 x 25 mm mild steel bonding stubs each 180 mm long to be welded on to each face at the tops of the piles to provide a key for the concrete, (these are not shown on the drawings).

One vertical pile to have a pile test with a maintained loading of 350 tonnes with various reactions.

Attachment:- Layout.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91996075
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As