Assignment- RORB

Aim: To determine the design hydrograph at a bridge site using RORB Design Brief:

The accompanying diagram is a map of the upper Deep Creek rural catchment with sub-areas A, B, C, D, E and F marked in.

The Client (The Road Authority) wishes to replace the old timber road bridge that crosses Deep Creek 200m south of the confluence with Boyd Creek. The new bridge is to be designed for a 50 year ARI flood.

Close to the bridge site there is a stream gauging station (O), which has been in place for eight years, and there is a telemetered pluviometer located at Romsey (?).

Tasks: (Each student must assume a team leadership role in the completion of at least one of these Tasks) (i) Using RORBWin, prepare a catchment file using the Graphical Editor and the following data.

Areas in km2 : A = 114.4, B = 86.9, C = 67.5, D = 81.7, E = 62.5, F = 75.6

Make clear any assumptions made.

Prepare a storm file and use it to calibrate the catchment. Use the storm file provided on page 2 based on a heavy 50 hour storm that fell over the catchment in 1996, which includes the hydrograph of runoff recorded at the Darraweit gauging station. The FIT run ‘statistics' window must be included in the report (See Lec.10, p82).

(ii) Prepare a storm file solely for the purpose of estimating the time of concentration for the catchment.

Based on the estimate for time of concentration, prepare a design storm file based on a standard temporal pattern (see p2) and use RORBWin to produce the hydrograph of runoff at the bridge site.

(iii) Prepare two other design storm files based on standard temporal patterns (to be specified by the Lecturer) for the purpose of determining the critical storm duration and the critical design flow rate for the design of the bridge.

Determine the peak design flow rates for these storms and report the results for all three storms to the Lecturer.

(iv) Prepare a group report containing:- College assignment cover sheet, title page, executive summary, table of contents with page numbers, this project brief, all relevant computations and results (including graphical outputs) set out clearly under meaningful sectional headings, including brief but comprehensive explanations of the methods employed and all assumptions made, and a conclusion. All work is to be performed to a professional standard.

Students are to work in groups of three maximum, share the tasks equally and thoroughly check each other's work. Each student is to take full responsibility for all the work submitted.

Note: The Table of Contents must show the name of the student who played a leading role in the completion of each Task or the preparation of the bulk of the content of the report based on that Task.

Storm File

50 HRS, 8PM 1996

FIT

C TIME INC IS 1.0HR, CALCS FOR 100 INCS, 1 BURST, 1 PLUVIS, R/F NOT UNIFORM 1.0,100,1,1,1,-99

C BURST FROM 0 TO 50

0,50

DARRAWEIT GUIM

1.2,3.9,3.6,2.9,3.0,2.6,3.2,2.9,3.8,3.9,4.6,5.2,4.2,3.6,3.0,2.7,2.8,2.6

2.2,2.2,3.2,3.4,3.3,4.8,4.4,2.7,2.7,3.6,3.6,1.9,1.6,1.2,1.1,1.2,1.1,0.7

0.9,0.9,0.7,1.2,0.5,0.3,0.4,0.6,0.6,0.2,0.2,0.2,0.1,0.1,-99, mm/hr

C RAINFALLS ON SUB AREAS (mm)

117,113,111,110,111,108,-99

C HYDROGRAPH DATA

1,100,-99

DEEP CREEK AT DARRAWEIT

0.46,5.46,15.46,20.4,26.5,30.0,36.0,35.0,40.0,49.0,66.0,83.0,96.0,110.0

120.0,110.0,101.0,96.0,94.0,90.0,114,123,126,128,130,135,138

142,151,155,152,142,138,130,125,117,113,108,106

102,98.0,96.1,93.7,91.4,90,85,80,75,70,68

66,65,60,57,55,54,53,52,51,48,45

44.50,43.15,39.81,36.73,32.04,31.53,30.24,27.17,24.30,21.63,20.37

19.16,18.0,16.88,15.80,14.77,13.79,12.85,12.85,11.95,11.09,11.09

10.27,10.27,9.49,8.75,8.75,8.05,7.39,7.39,6.76,6.76,6.76,6.76

6.16,6.16,6.16,6.16,6.16,-99, cumecs

Standard temporal patterns for Zone 1: Isohyetal Map (1996 Storm).

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91407812
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As