Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Assignment - Open Channel and Pipeline Flow

Objectives

1. Evaluate and apply the equations available for the description of open channel flow

2. Solve simple pipe networks using an appropriate method

3. Apply rigid and elastic water hammer theory to the analysis of pipeline systems

4. Design a range of hydraulic structures including: fixed and movable crest weirs; gated control structures; pipe conveyance structures; spillways and energy dissipation structure; critical flow measuring flumes; gulley control structures; weir and culvert type structures using the minimum specific energy concept.

Question 1 - Pipe Network

A pipe network system as shown in Figure 1 supplies water from two reservoirs (G & H) to a number of delivery points. The Table shows the details of each pipe.

1725_figure.jpg

The pressure head at points H & G is given in terms of metres head of water (Figure1). You may neglect all minor losses that may occur in the system.

Pipe

AB

BC

CD

DE

EA

AF

FD

GC

HA

Length (m)

160

350

280

560

190

230

210

125

125

Diameter (mm)

200

200

180

180

185

185

160

250

250

Roughness (mm)

0.09

0.10

0.07

0.12

0.13

0.14

0.16

0.08

0.08

a) Use the linearisation method to solve for the unknown discharges in each pipe of the network.

b) Assuming the network is situated on a level grade estimate the pressure head in metres at each pipe junction (A, B, C, D, E, F)

HINT:
- The partial loop from H, A, B, C, G can be analysed as a normal loop once you account for the difference in energy (water level) between the reservoirs.
- Nodes H and G do NOT have node equations
- you only need to remove node equations if you have too many equations
- You should end up with 3 loops

Question 2 - Surge Tank

A hydroelectricity plant is supplied from a reservoir via a pipeline 1.8 km long and 3 m in diameter. This pipeline is made of cast iron (k=0.25 mm) and terminates at its downstream end in a control valve. The water level at the reservoir is maintained at a constant 25 m above the inlet end of the pipeline.

You have been given the task of determining the size of the surge tank which is to be installed at the downstream end of this pipeline and immediately upstream of the valve. This tank must be designed in order to deal with the surge that would occur when the valve downstream of the tank is closed completely and instantaneously.

Model the flows within the pipe and surge tank using the numerical solution technique (equations & 12.22) described by Marriott (Nalluri and Featherstone) in Section 12.4. You should use a time step of 5 seconds or smaller and account for the change in f with velocity.

Task:

a) Determine the minimum surge tank size (nearest ½ m) to satisfy the max. allowable height

For the case of complete closure (Q changes from (10 + 1 × N1) m3/s to 0 m3/s)

b) Plot the water level in the surge tank (relative to reservoir) over time for at least 2 upsurges

c) Plot the velocity in the pipeline over the same period (different set of axes).

HINT- The initial water level in the tank is below the level in reservoir by distance of hf at full flowing condition

Question 3 - Control Structure

A reservoir supplies water to an irrigation scheme via a diversion channel. The channel is 2 m wide and is constructed of concrete with Manning n 0.016. The bed slope of the channel is 0.0017. The discharge into the channel is controlled by a vertical sluice gate (Cc = 0.61).

The water depth in the upstream of the gate is maintained at a constant depth of 2.9 m, and the maximum allowable discharge to the diversion channel is 12 m3/s. The depth on the downstream side of the gate is at normal depth.

You have been asked to develop the rating curve for the sluice gate (YG vs Q). Table below is incomplete tasks for this rating curve.

Q

Yg

(free flowing)

Yg

(for submerged)

Yn or Y3

(m3/s)

(m)

(m)

(m)

1

0.110

??

0.431

2

0.222

??

0.701

3

0.337

??

0.943

4

0.455

??

1.171

5

0.575

??

1.392

6

0.698

??

1.607

7

0.824

??

1.819

8

??

??

??

9

??

??

??

10

??

??

??

11

??

??

??

12

??

3.121

??

Your Tasks:

(a) Calculate the missing gate openings for free flowing condition and normal depth in the table.

(b) Determine at what discharge the gate changes from freely flowing to submerged conditions (to the nearest m3/s)

(c) Calculate the new gate opening (YG) for those discharges for where the gate is submerged by the depth downstream of the gate.

(d) Plot the rating curves (show both the free flowing and altered part where the gate is submerged)

* Need question number 2.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92815741
  • Price:- $55

Guranteed 36 Hours Delivery, In Price:- $55

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As