Ask Civil Engineering Expert

Assessment: Design of Timber structures

(1) Tension Design

The main roof trusses of a restaurant in Mildura, Victoria will be fabricated from 35 mm thick seasoned Australian hardwood, marked as F14 and bolted together using steel gusset plates. Connections will be at each end of the member. The roof truss will span 12 m, will be 3 m apart and will support purlins, insulations and steel sheet roofing. The bolted connection at each end will use 4 M12 bolts in rows of two bolts. It is also identified that the cross-section of timber chosen must be more than 80 mm deep in order to accommodate the connection.
A tension chord in the trusses has the following unfactored loads: Permanent action 6.5 kN (tension)
Imposed action (construction) 3.0 kN (tension)
Imposed actions- from lights and a/c (fixtures) 2.3 kN Ultimate wind load giving tension in the chord 3.5 kN
It is to be noted here that roof furniture/ fixtures- lighting and air conditioning are considered as permanently acting imposed loads.

a) Find the factored strength limit state load combinations for the design of the chord as a tension member. Consider at least the following combinations:
- Permanent action plus imposed action (construction)
- Permanent action plus imposed action (fixtures)
- Permanent action plus imposed (fixtures) plus ultimate wind load (tension)
b) For the strength limit state, select the appropriate size material from the sizes given in the following Table 1.

(2) Compression Design

You have been asked to design the timber bridge piles at Jenolan (New South Wales) to resist vertical imposed and permanent actions using F17 unseasoned hardwood (which is locally available near bridge site). The piles are 13.5 m long and are effectively pinned at each end. Cross-bracing is provided in the plane perpendicular to traffic flow, at a maximum spacing of
4.5 m.
Assuming the piles are circular and same diameter is used throughout its length, determine the minimum nominal diameter required to resist the following loads per pile:
- Permanent action 60 kN (compression)
- Imposed action (DOL - 5 months) 145 kN (compression)

(3) Bending Design

Calculate the following:

a) Find material constant for beams (ρb) for glulam grade GL12 used with a loading consisting of 0.8 kN/m permanent load and 2.4 kN/m short-term occupancy imposed load.

b) Find the k9 factor for a group of F14 seasoned hardwood floor joists with a spacing of 450 mm and a span of 3.2 m supporting 19 mm plywood flooring.

c) As part of designing a timber beam to support a railway track (Figure a) as it passes over a small drain at Westgate golf club near Melbourne, you are required to calculate the stability factor k12. The only timber you have at your disposal is some new unseasoned visually graded F17 hardwood sleepers 250 × 150 and with following configuration (Figure b). Calculate the stability factor for the configuration (III) of Figure b.

297_Steel and Timber Structures.jpg

Attachment:- Steel.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M93102305
  • Price:- $65

Priced at Now at $65, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As