Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

Assessment -

What you have to do - Refer to the following to help you complete the questions below:

  • Project 1 on the OLS
  • Subcontractor/supplier spreadsheet attached - One (1)
  • Subcontractor quotations attached- Two (2)

Scenario - You are a small builder and you have decided to tender for the construction of a residential dwelling (referred to as Project 1). The documentation you have received includes a specification, architectural drawings and a site plan.

You have perused the documents and have decided to produce your own cost estimates for some trades and to request quotes for others, as noted below. Some of the trades have been assigned a provisional sum.

Preliminaries

Cost

Excavator

Cost

Concretor

Request quotations

Plumber/Drainer

Provisional sum

Metalworker

Request quotations

Carpenter

Cost

Bricklayer

Cost

Roofer

Request quotations

Electrician

Provisional sum

Wallboard fixer

Request quotations

Floor & wall tiler

Cost

Painter

Cost

Task 1 - From the tender documents and other information provided:

(a) Complete the Subcontractor/supplier spreadsheet for the trades for which you are requesting quotes, and for the supply of bricks, and aluminium windows and doors. You may use fictitious names and contact numbers for subcontractors and suppliers.

Note that you must complete the columns 'Trade', 'Subcontractor' (or Supplier), 'Contact', 'Relevant Drawing Numbers', 'Relevant Specification Pages' and 'Date Sent', for each of these. Ensure that you include all relevant documentation for each of the trades/suppliers to enable them to give you an accurate and complete quotation.

(b) You would include a covering letter to accompany the documentation that you send; a separate letter format for each trade and supply product.

Prepare a sample covering letter to accompany the documentation that you are sending: prepare a letter for one of the trades and another for one of the supply products.

Task 2 - Included in this assignment are two (2) sample quotations from wallboard fixers to complete the lining of the dwelling detailed on the plans. The quotations are for the same project and the parties have done their own measure during a site inspection. The extent of the works was verbally communicated to both potential sub-contractors by you, the builder, so no variation to the work is anticipated.

The quotations are 'lump sum' and contain a number of conditions which will need to be assessed before you make your decision on which quotation to accept.

West Coast Plasterboard is not known to you but Sound Interiors P/L has come highly recommended.

You are to analyse these quotations and choose your preferred subcontractor for this trade. Provide a justification for your decision detailing your concerns by comparing these quotations.

Task 3 - There are many risks involved in preparing a tender.

(a) Identify the main risks that should be considered prior to tendering for a construction project. The risks can be those applicable to all building projects and some will be specific to the nature of this job and the contract documents.

(b) Identify the main risks involved with engaging sub-contractors and suppliers who are not known to you.

Attachment:- Assignment Files.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92670739
  • Price:- $70

Guranteed 36 Hours Delivery, In Price:- $70

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As