Apply building codes and standards to the construction process for low rise building: Assessment

Question 1 - Project 1

This question relates to Project 1. You will need the Project 1 documentation and access to the relevant volume of the Building Code of Australia.

You are required to undertake a BCA compliance check for the dwelling in Project 1.

Present it in a format which is easy to follow and understand.

When you are checking compliance against a document such as a Standard or the Building Code of Australia, it is useful to present your information in a table. This makes it easy for you, or anyone who picks up your document, to follow your assessment. An example of the headings you may want to use is shown below.

BCA Section and Part

BCA Performance requirements

Proposed Project

Complies Y/N

As a minimum, you are required to check BCA compliance of Project 1 against the following areas: •

Fire safety

  • Fire separation
  • Smoke alarms

Health and amenity

  • Room heights
  • Facilities
  • Light to study and Bedroom 3
  • Ventilation to ensuite and Bedroom 4

Safe movement and access

  • Stair construction
  • Balustrades

Ensure you include what Class of Building Project 1 is and what volume of the BCA you have used to check compliance. Also include a list of Australian Standards that would be applicable to Project 1.

Question 2 - Project 2

This question relates to Project 2. You will need the Project 2 documentation and access to the relevant volume of the Building Code of Australia.

Firstly, consider the project and complete the following table with regards to the BCA.

Classification

 

Number of storeys contained

 

Rise in storeys

 

Type of construction required

 

Effective height

 

Now, for the following areas, provide the Sections and Clauses of the BCA where you would locate the Deemed to Satisfy (DTS) Provisions.

Fire Resistance

  • Type of construction
  • Separation by fire walls
  • Doorways in fire walls

Access and Egress

  • Exit travel distances
  • Measurement of distances
  • Fire isolated stairs or ramps
  • Pedestrian ramps
  • Signs on doors
  • Car parking
  • General building access requirements
  • Access to buildings
  • Parts of buildings to be accessible

Services and Equipment

  • Fire hydrants
  • Hose reels
  • Sprinklers
  • Portable fire extinguishers
  • Emergency lighting requirements
  • Exit signs

Health and Amenity

  • Methods and extent of natural light
  • Artificial light
  • Ventilation of rooms
  • Sound insulation rating of floors
  • Sound insulation rating of walls
  • Sound insulation rating of services

Ensure you present the information in a way that is easy to follow. A table may be helpful here.

Question 3 - Project 3

This question relates to Project 3. You will need the Project 3 documentation and access to the relevant volume of the Building Code of Australia.

Firstly, consider the project and classify the building under the Building Code of Australia.

Now, assess what the building would require, or need to be designed to include, to comply with the following aspects of the Building Code of Australia.

Once again, it is useful presenting this information in a table format. You may wish to use the following headings:

BCA Section and Clause

BCA performance requirements

Proposed project requirements

Access and Egress

  • Exit travel distances
  • Fire isolated stairs or ramps
  • Pedestrian ramps
  • Signs on doors
  • Car parking
  • General building access requirements
  • Access to buildings
  • Parts of buildings to be accessible

Services and Equipment

  • Fire hydrants
  • Hose reels
  • Sprinklers
  • Portable fire extinguishers
  • Emergency lighting requirements
  • Exit signs

Attachment:- Assignment Projects.rar

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92684438
  • Price:- $125

Guranteed 48 Hours Delivery, In Price:- $125

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As