Answer three questions from Part 1. Your answer for a question (including subparts) in this part may be around 1000 to 2000 words (for each Question). In addition, you can include representative diagrams/ figures and tables (if so relevant).

[Hint: You may study various online journals from library, identify relevant research papers/ reports; also you may consider hypothetical or practical contexts & data e.g. a specific role in relevant project-based or manufacturing industry - to prepare your answers including diagrams, discussions and conclusions]

1. You are responsible to design the facility layout for: (i) a precast panel manufacturing unit
Hint: your answer, From the resource management perspectives for (a) one-off or less routine operations; and (b) routine or frequent operations, outline your layout design with supporting justifications and discussions.

2. . You are responsible to design the facility layout for automobile remanufacturing unit in a suburb area near a large metropolitan city.
Hint: YOUR ANSWER,From the resource management perspectives for (a) one-off or less routine operations; and (b) routine or frequent operations, outline your layout design with supporting justifications and discussions

3. Assume that you are working in an international organization which undertakes major metro rail and other infrastructure projects in Australia, Asia and Europe. As a part of your Australia division's improvement initiative, you are assigned to prepare detailed report on resource planning and management aspects for any two of the following: a. Reliability centered maintenance management of key equipment resources (you may assume one particular equipment); b. Ethylene tetrafluoroethylene (ETFE) as an alternate material choice

c. Employing drones in project delivery OR asset management (you shall answer either project delivery OR asset management aspect) d. Use of autonomous (driverless) vehicles in large construction projects OR mining industry

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92259856
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As