An uneven or abnormal symmetry observed following the stakeout of a horizontal curve is usually an indication of a:

A. spiral curve.

B. curve embankment.

C. surveying error.

D. high design speed.

An offset stake is installed:

A. after the point of intersection.

B. for use as an undisturbed reference to a centerline stake.

C. one station after station 0+00.

D. when the surveyor uses GPS.

What is the distance that an offset stake is set from a centerline stake?

A. 2 feet

B. Half the distance from the beginning of curve to the point of intersection

C. 100 feet

D. The distance varies depending on the site

Offset stakes are installed to reduce the:

A. amount of construction staking necessary to maintain line and grade for the highway centerline.

B. quantity of vertical curves in a highway survey.

C. size of horizontal curves on a rural highway construction.

D. engineer’s design workload.

Vertical curves are used in highway construction to provide a:

A. point of intersection between survey stations.

B. method to go over rivers and streams.

C. gradual change between two adjacent grade lines.

D. fun highway to drive on.

When staking out a vertical curve, the point of intersection is:

A. the instrument setup point.

B. a point unable to be staked, as it is an extension of the legs of the curve tangents that is in the air or under the ground.

C. where the vertical and horizontal curves come together.

D. equally spaced between the beginning of the curve and the end of the curve.

The location of a vertical curve’s high and low points are important for:

A. drainage.

B. friction.

C. curve embankment.

D. station intervals.

The proposed route of a highway is typically chosen based in part on the:

A. result of the preliminary survey.

B. lengths of horizontal curves along the route.

C. last aerial photograph taken before construction begins.

D. height of the summation of vertical curves along the proposed route.

Except for changes in direction, highways are laid out in what station intervals?

A. 25 feet

B. 50 feet

C. 1000 feet

D. 100 feet

Clearing and grubbing are done to:

A. ensure the compensator in the automatic level is not stuck.

B. remove trees and vegetation along the proposed route of a highway or linear construction project.

C. clean the total station prior to staking out the highway centerline.

D. maintain a line of site around horizontal curves for faster drivers.

A marking on a slope stake of 3:1 indicates:

A. a total of 3 station intervals for every 100 linear feet.

B. three horizontal feet for every one foot of vertical change in grade.

C. an extremely steep class 3 slope embankment.

D. a vertical curve location marker.

The indication of a cut on a slope stake means the:

A. grade at the location of the stake needs to be increased in the amount equal to the indicated cut.

B. road must be kept flat in this area.

C. grade at the location of the stake needs to be reduced in the amount equal to the indicated cut.

D. ground is unstable in this area.

Layout for line and grade on highway construction projects is usually obtained:

A. one time.

B. two times.

C. when the contractor submits the pay request.

D. as often as necessary, but typically three or more times.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91092298

Have any Question?


Related Questions in Civil Engineering

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As