Air enters a turbine operating at steady state with a pressure of 75 lbf/in.2, a temperature of 800°R, and a velocity of 400 ft/s. At the turbine exit, the conditions are 15 lbf/in.2,600°R, and 100 ft/s. Heat transfer from the turbine to its surroundings takes place at a location where the average surface temperature is 620°R. The rate of heat transfer is 10 Btu per lb of air passing through the turbine.

(a) For a control volume including only the turbine and its contents, determine the work developed, in Btu, and the rate at which entropy is produced, in Btu/°R, each per lb of air flowing.

(b) For a control volume including the turbine and a portion of its immediate surroundings so that the heat transfer occurs at the ambient temperature, 40°F, determine the rate of entropy production in Btu/ °R per lb of air passing through the turbine. Explain why the entropy production value of part (b) differs from that calculated in part (a).

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91731007

Have any Question?


Related Questions in Mechanical Engineering

Fluid mechanics assignment - finite control volume analysis

Fluid Mechanics Assignment - Finite Control Volume Analysis and Dimensional Analysis Q1. The wind blows through a 7ft × 10ft garage door opening with a speed of 5 ft/s as shown in the figure. Determine the average speed, ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Fluid mechanics assignment - viscous flow in pipesq1 as

Fluid Mechanics Assignment - Viscous Flow in Pipes Q1. As shown in the figure below, water "bubbles up" 3 in. above the exit of the vertical pipe attached to three horizontal pipe segments. The total length of the 0.75-i ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Expansion processes of a perfect gasassignment1 attend the

Expansion Processes of a Perfect Gas Assignment: 1. Attend the laboratory class and complete the lab tests according to the supervisor's requirement. Students will not allowed to submit their report if they do not come t ...

1 explain the term critical equipment and provide two clear

1. Explain the term "critical equipment" and provide two clear examples of machinery which falls into this category on board a twin screw motor vessel. 2. Explain the process of Charpy lmpact Testing including sample mar ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year