Aim

To demonstrate knowledge and understanding of hydrograph analysis, water supply, distribution system and practical application of the rainfall measurement in hydrological studies.

Objective

- To be familiarize with the design of water supply system and hydrograph analysis.
- To interpret different types of devices used to measure rainfall.
- To explain components of a meteorology station
- To investigate new technologies used in water resources engineering.

Tasks

Task-1: Field Visit Report

Site visit will be arranged for a meteorology station to observe the process of rainfall measurements followed by the assessment based on the field visit report submission.

Your task is to observe steps carried out for the measurement of different parameters and try to find out the information about the following:

- Main objectives of rainfall measurement
- Types and details of rainfall gauges
- Graphical representation of rainfall depth with time

Requirement for the Report

Write a full detailed report on the field visit meteorology station i.e., component and observations at the site. Total marks will be out of 50 for the report. The weightage is 50% from the total coursework.

The last date of submission is 20-November-2016. Marks distribution for the different parts of the report is presented in the table below:

Introduction, Role and importance of meteorology station, number of meteorology station in Oman.

Critical Review of rainfall measurement technologies

Indicate the main parameters measured in a typical meteorology station and explain the technics used for each measurement.

Write about the site visit presentation and explain what you learned from it.

Application: Construction of a hyetograph of a given storm

Conclusion and Recommendation

References

Task-2: Class tutorial

- Timed assignments will be conducted at the beginning of a class session.

- They will occur with prior announcement

- They are short class tutorial covering assigned reading materials and the previous lecture(s), and take about one hour to solve a simple design problem

- If a student did not attend a class tutorial for a genuine reason, a replacement assessment will be scheduled for him/her and the mark will be capped to 80% of the scored mark.

- If a student did not attend an assessment and fail to produce a genuine reason, no replacement assessment will be scheduled for him/her and only ZERO mark will be awarded for that assignment.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M92033270
  • Price:- $75

Priced at Now at $75, Verified Solution

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year