A new rural by-pass has been proposed for a small town, with three possible routes under consideration. Using the data in the table below and the procedures in WebTAG (see the link below), undertake an economic appraisal of the proposal, comparing its capital and recurrent costs with benefits deriving from:

(i) Travel time savings

(ii) Accident savings

(iii) Changes in Vehicle Operating Costs (VOC) and carbon emissions

Assumptions

  • Traffic levels and speeds remain constant over the appraisal period.
  • All vehicles cover the whole length of the road
  • The project life is 30 years
  • There areonly petrol carson this road
  • For Values of Time, use values for the 'average car'
  • Use 'link and junction' combined accident rates. (Don't subdivide accidents by severity).
  • Fuel costs vary over the project life as forecast by the central oil price scenario in WebTAG.
  • Use VOC values for the 'average car'
  • Base year for discounting is 2012 and the base test discount rate is 3.5%.
  • Use market prices at 2012 levels. Adjust for indirect tax where appropriate.
  • Assume maintenance costs etc. for the old road are the same whether or not the new road is built.

Make and justify all other assumptions as necessary.

1.Using MS Excel or similar, calculate the PVC, PVB, NPV, BCR, IRR and FYRR of the four options detailed on the attached data sheet.Summarise these in a report along with sufficient text and details of the calculations made to explain what you have done and why.State which option should be chosen based on these criteria, and give reasons for your choice. Note that you are dealing with a variable trip matrix and that you should use the rule of half to account for generated traffic.

 

2.To what extent might your results be affected by optimism bias and how should you adjust for this?

 

3.Outline the advantages and disadvantages of the main alternatives to cost benefit analysis

Note: Always indicate which section of WebTAG the procedures you are using come from.

Option 0: Do nothing- retain existing road

Option A: Build scheme A alongside retention of existing road

Option B: Build scheme B alongside retention of existing road

Option C: Build scheme C alongside retention of existing road

 

 

Option 0- Do nothing

Option A

Option B

Option C

Road Type

Older S2 A Road

Modern D2 Road

Modern D2 Road

Modern D2 Road

Road length (km)

6

10

8.5

12

Average speed on original road (km/hr)

22 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

28 (30 mph limit)

Average speed on new road (km/hr)

n/a

65 (60 mph limit)

55 (60 mph limit)

65 (60 mph limit)

Traffic on original road (AADT)

16000

4000

6000

4500

Traffic on new road (AADT)

n/a

14000

12000

13500

Construction costs per km

n/a

£9m

£12m

£6m

Construction period (years)

n/a

2

2

2

Road management, maintenance etc. per km per annum

 

£10k

£10k

£10k

 

Sources and Some References:

 

Department for Transport (2011) The Transport Business Case.

http://www.dft.gov.uk/publications/transport-business-case/

Design Manual for Roads and Bridges (DMRB) Volume 13.www.standardsforhighways.co.uk/dmrb

Highways Agency Post Opening Project Evaluation (POPE) of Major Schemes

http://www.highways.gov.uk/roads/18386.aspx

Includes evaluation of a number of by passes.

WebTAG: Website for Transport Analysis Guidance

http://www.dft.gov.uk/webtag/

Adler, H.A (1987) Economic Appraisal of Transport Projects: A Manual with Case Studies. John Hopkins University Press.

Flyvbjerg, B., Bruzilius, N. and Rothengatter, W.(2003). Megaprojects and Risk. An Anatomy of Ambition. Cambridge University Press.

HM Treasury (2011) The Green Book. Appraisal and Evaluation in Central Government.http://www.hm-treasury.gov.uk/data_greenbook_index.htm

Rogers, M. (2001) Engineering Project Appraisal. Blackwell. Chapter 7 onwards

Snell, M. (1997) Cost-benefit Analysis for Engineers and Planners. Thomas Telford, London.

Willis, K., Garrod, G. and Harvey, D. (1998) A Review of Cost-Benefit Analysis as Applied to the Evaluation of New Road Proposals in the UK. Transportation Research D,3, 3, 141-156.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91420781
  • Price:- $65

Priced at Now at $65, Verified Solution

Have any Question?


Related Questions in Civil Engineering

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As