A haul fleet of trucks having a heaped capacity of 15 cy. is to be loaded by a hydraulic backhoe excavator (CT=.48 min.) with a 3 1/2 cy. heaped capacity. Assume the material is a wet loam that weighs 3380 lb/cy in the bank state and has a swell factor of 1.2 and the bucket fill factor is 95% with this material. Assume that the haul and return times together are 10.5 minutes (this does not include load and dump times) and a 45 min.- hr. is worked. The project has to move 24,000 LCY, the backhoe cost $600 per day, the trucks $40/hr, and operators cost $20/hr for both trucks and backhoe. Assume the swing depth factor is 1.0. Assume truck dump time is 1.4 minutes. (60 points)

1. Calculate the Excavator Production using the process in your text. Remember, the cycle of the backhoe was given above. Use equation 9.2 from page 271 to calculate excavator production. You don't need to convert to BCY. You don't have to calculate a cycle time for the backhoe. It is given above.

a. 260 LCY/hr b. 477 LCY/hr c. 312 LCY/hr d. 156 LCY/hr

2. Determine the cycle time of the trucks, including load, haul, dump, and return. The haul and return times are given above. When calculating load time, round up the number of MINUTES to the nearest whole number.

a. 11.3 min/cycle b. 12.3 min/cycle c. 16.1 min/cycle d. 13.9 min/cycle

3. How many trucks are needed to service the backhoe? Assume the trucks limit production. Round up your answer to the nearest whole number.

a. 4 trucks b. 5 trucks c. 6 trucks d. 7 trucks

4. How many trucks are needed to service the backhoe? Assume the excavator limits production. Round up your answer to the nearest whole number.

a. 4 trucks b. 5 trucks c. 6 trucks d. 7 trucks

5. What would be the cost per LCY at 75 % efficiency if the trucks limit production? Assume an 8-hr work day and round up your "DAYS" example = 9.52 = 10 days.

a. $1.29/LCY b. $2.15/LCY c. $1.01/LCY d. $1.71/LCY

6. What would be the cost per LCY at 75% efficiency if the backhoe limits production? Assume an 8-hr work day and round up your "DAYS" example = 9.52 = 10 days.

a. $1.46/LCY b. $2.15/LCY c. $1.13/LCY d. $1.96/LCY

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9891429

Have any Question?


Related Questions in Civil Engineering

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As