Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Mechanical Engineering Expert

A gold processor has three mines of gold ore, mine A, mine B, and mine C. In order to keep his plant running, at least 200 tons of ore must be processed each day. Ore from mine A costs $200 per ton to process, ore from mine B costs $100 per ton to process, and ore from mine C costs $150 per ton to process Moreover, Federal Regulations require that the amount of ore processed from one mine cannot exceed twice the amount of ore processed from any other mine.

Ore from mine A yields 2 oz. of gold per ton, ore from mine B yields 3 oz. of gold per ton, and ore from mine C yields 2.5 oz. of gold per ton. Because of the purity of the gold from each mine, each one yields a different price. Mine A yields $450 per oz, mine B yields $380 per oz, and mine C yields $420 per oz.

Historical data shows that the maximum yield of ore from mine A is 120 tons per day, mine B is 150 tons per day and mine C is 80 tons per day. The maximum number of workers the can work mine A is 55, mine B is 70, and mine C is 40. The capacity of each mine is proportional to the maximum number of workers working that mine. For example if mine B has 70 workers, it can operate at 100% capacity and produce 150 tons per day, if it has 35 workers it is operating at 50% capacity and can produce 75 tons per day. The capacity of each mine is required to operate at least above 70%.

There are also ratio requirements for worker to trucks and jack hammers for each mine.
For every 10 workers at each mine, there must be at least one truck and for every 5 workers at each mine there must be at least 1 jackhammer. The company has 135 workers, 14 trucks, and 30 jackhammers, not all workers, trucks and jackhammers have to be assigned. Each worker costs the company $500 per day, each truck costs the company $2,800 per day to operate and each jackhammer costs the company $300 per day. Total costs must be kept to less than $150,000 per day, including labor, equipment and processing costs.

How many workers, trucks, and jack hammers should be assigned to each mine in order to maximize profit? What will be the maximum profit? What will be the cost and revenue? Assume the decision variables can be fractional values.

1. Formulate a linear programming model for this problem by:
A. Listing and labeling all of the decision variables.
B. Creating an objective function for the model.
C. List all of the constraints for the model.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M91002308

Have any Question?


Related Questions in Mechanical Engineering

1 explain the term critical equipment and provide two clear

1. Explain the term "critical equipment" and provide two clear examples of machinery which falls into this category on board a twin screw motor vessel. 2. Explain the process of Charpy lmpact Testing including sample mar ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Life cycle assessmentfor your chosen service eg white

LIFE CYCLE ASSESSMENT For your chosen service (e.g. white board markers), identify two alternatives of getting the service (e.g. brand A, brand B). Choose the most environmentally friendly option by conducting life cycle ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Problem on shaft -assuming no frictional losses a torque of

Problem on Shaft - Assuming no frictional losses, a torque of T = 750lb·in is applied through the shaft of gear F in order to drive the roller chain at point B at a constant speed. The chain sprocket has a pitch diameter ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As