Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

A gauging structure is to be built across an artificial drainage channel in order to measure discharges. Designers have settled on a contracted sharp crested rectangular weir. The channel cross section is trapezoidal in shape, with a bed width of 3m and side slopes of 1 Vertical to 3 Horizontal. The bed and wall of the channel is covered with grass with an estimated Manning's n of 0.045. Along the length of the channel the bed drops by an average of 2.5 metres every kilometre. Historic accounts indicate that the maximum flow of water in the channel prior to the construction of the gauging structure was 1.4 m. As the channel cross section is relatively consistent over its length we can assume that in the absence of the gauging structure that water flows at normal depth. The general equation for flow over a weir is given by:

d ideal Q = C ×Q

Where Q is the actual flow rate, Qideal is the discharge estimated from conservation of energy principles and Cd is an experimentally derived coefficient which is dependent on the shape of the weir and the depth of water flow. In the calculations for flow over the weir you are instructed to account for the approach velocity to calculate the value of Qideal. In order to measure discharge an ultrasonic senor is to be located just upstream of the weir. The selected sensor has a maximum range of 1m, i.e. (max reading) - (min reading) = 1.0m

Weir Design Criteria:

To avoid submergence the crest of the weir must be at least 0.05 m above the downstream water depth. Here we can assume that the depth downstream is equal to the normal depth. To simplify calculations we will assume that Cd = 0.7 Water depth over the weir will be restricted by the range of the sensor.

Tasks:

a) Design the weir structure in order to accommodate the design max flow and maximise the use of the electronic sensor. Design variables include weir width and height of crest above the bed.

b) Use the direct step method to determine water profile upstream of the weir as a result of the weir. Plot the longitudinal bed, water surface and energy profiles over the length of this profile.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9899497

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As