Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

A disgruntled employee in an engineering company is intent on destroying a large steel plate used in a valuable engineering component. One evening, after the normal working hours, he cuts a very sharp notch in the edge of the plate. He orients the sharp flaw normal to the direction in which tensile stresses are applied to the plate, with the hope that the flaw would eventually result in catastrophic fracture of the plate. As he is committing the crime, a bystander telephones the plant foreman at the foreman's home. The fore-man, who leaves his home two minutes after the notification is received, travels to the scene of crime on his bicycle at an average speed of 15 km/hr. Would he have reached the plant in time to shut off the equipment before the plate fractures catastrophically? Here are some useful data for your analysis:

(i) The plate is cyclically loaded uniformly from 5 to 85 kN at a frequency of 75 Hz.

(ii) The plate is 18 cm wide and 0.5 cm thick,

(iii) The yield strength of the steel is 1250 MPa and the plane strain fracture tough ness is 48 MPa

(iv) The flaw introduced by the employee is 1 cm in length, through the thickness of the plate,

(v) The bystander, who notified the foreman, reported to the police, by phone, that, in his judgement, the crack in the plate was propagating at a velocity proportional to the crack tip opening displacement corresponding to the peak load of each cycle,

(vi) Post-failure fractographic examination revealed the presence of fatigue striations with a mean spacing of 2.5xlO~4 mm where the crack was 2.5 mm long,

(vii) The distance from the foreman's home to the factory is 5 km.

(viii) The time interval between the two phone calls was 10 minutes. State all your assumptions clearly

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91794134

Have any Question?


Related Questions in Civil Engineering

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As