Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Civil Engineering Expert

(a) Develop your knowledge of key principles relating to wastewater system design

(b) to develop technical competence in problem formulation and solution in this discipline area, and

(c) to improve your teamwork and technical communication skills, with particular emphasis on presentation and setting out solutions.)

Part A will be the estimation wastewater flows and Part B will be the design of trickling filter-activated sludge system.

PART A: Estimation of Wastewater Flows

Data on the expected saturation population densities and wastewater flows for the various types of housing in the New Park Development (Figure 1) were derived from the actual records of similar nearby developments and are given in the table (Table 1). The flowrate allowances for the commercial (including the shopping area) and industrial wastewater were estimated to be 25 and 35 m3/(ha.day) respectively.

131_Principles relating to wastewater system design.png

Figure 1: Classification of land use

On the basis of actual flow records of similar activities, the average peak factors are 2 for the commercial flows and 2.5 for the industrial flows. The planned school within the New Park Development is to serve 2500 students at ultimate capacity. The average flow is 80 L/(student. day), and the peak factor for the school is 4.0.

Assume the average park attendance is 300 persons/day and the flow is 70 L/person.d.  The peaking factor for the park is 4.0. Estimate the expected average and peak wastewater flows from the New Park development at the end of full development.

PART B: Designing of Trickling Filter (TF) /Activated Sludge (AS) Systems

A TF/AS process is used after primary clarification and the primary effluent wastewater characteristics are given below (Table 2). For the following design parameters, compare the effect of designing the plastic tower trickling filter for 40 percent versus 75 percent BOD removal:

1. Trickling filter diameter (m) and hydraulic application rate (L/m2.s)

2. Oxygen required in the activated -sludge aeration tank (kg/d)

3. The amount of solids wastes per day (kg/d)

4. The volume (m3) and hydraulic retention time (h) of the aeration tank.

Use the following assumptions for the trickling filter and activated sludge design.

Trickling Filter:

Plastic packing treatability coefficient, k20 = 0.18 (L/s)0.5/m2

Packing depth = 6.1 m

Number of towers = 2

50 percent of theoretical effluent BOD is soluble

Activates sludge:

SRT = 5.0 day (no nitrification)

MLSS = 3000 mg/L

Biomass yield , Y = 0.6 g VSS/g BOD removed

Endogenous decay, kd = 0.12 g VSS/g VSS.d

UBOD/BOD = 1.6

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91247659

Have any Question?


Related Questions in Civil Engineering

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As