Ask Civil Engineering Expert

problem 1: A concentric tube heat exchanger is comprised of a thin wall inner tube of 25.4 mm diameter and an outer tube of 47 mm diameter. The heat exchanger is used for cooling lubricating oil. The exchanger operates in counterflow, the inner tube carrying water and the outer tube carrying the oil with an overall heat transfer coefficient of 65 W/m2K.

a) If the oil outlet temperature is 55oC, determine the total heat transfer and the water outlet temperature.
b) Determine the length required for the tube heat exchanger.

problem 2
: A concentric tube heat exchanger, counterflow arrangement was designed to heat water from 20oC to 80oC using hot oil that is supplied to the annulus at 160oC and discharged at 140oC. The thin-walled inner tube has a 20 mm diameter. The overall heat transfer coefficient if 527 W/m2 K. The designed condition requested a total heat transfer rate of 3700 W.

a) What  is the length of this heat exchanger?
b) After 3 years of operation, the heat exchanger performance is degradated by fouling on the water side, and the water outlet temperature is 57oC for the same flow rate and inlet temperatures. What are the corresponding values of the heat transfer rate, the oil outlet temperature, the overall heat transfer coefficient, and the water side fouling factor, R”f,c?

problem 3: A Shell-and-tube Heat Exchanger (1 shell pass, 2 tube passes) is to be used to condensate 3.21 kg/s of saturated steam at 350K. Condensation occurs on the outer tube surfaces, and the corresponding convection coefficient is 10,215 W/m2K. The temperature of the cooling water entering the tubes is 15oC. Thin-walled tubes of 20mm diameter are specified, and the mean velocity of water flow through the tubes is to be maintained at 0.45 m/s.

a) What  is the minimum number of tubes that should be used?
b) What  is the corresponding tube length per pass?
c) To reduced the size of the heat exchanger, it is proposed to increase the water side convection coefficient by inserting a wire mesh in the tubes. If the mesh increases the convection coefficient by 2, what is the required tube length per pass?

problem 4: A customer requested the design of a Heat Exchanger and provided the following information to the Engineering Department. In his factory, as part of the process upgrade, there is a need to heat 97.2 m3/hr of cold water from 32oC to 60oC. The heat is available from 100.8 m3/hr of hot water at 90oC. The customer does not know of any other information that could lead to a final configuration of heat exchanger type. In this initial stage, he requires a preliminary design that can be evaluated to determine what additional requirements should be considered.

In a meeting conducted at the Engineering Department, it was decided to:

a) Design the Heat Exchanger with the information provided. In this stage, all assumptions must be listed and describeed for customer evaluation and review.

b) Prepare Heat Exchanger drawings of the proposed solution/s.

c) At the same time, the design must be evaluated to identify features and configurations that could be discussed with the customer with the aim of developing more complete specifications.

d) Cost analysis in not required.

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91949

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As