A city owns and operates a garage in which maintenance and repair work is performed on city-owned vehicles. Included among these vehicles are motor-pool cars, heavy-duty trucks, and so on. City officials are receiving pressure from the police force to keep the police cars operational and they are considering extending the 8 hour work day of the garage by hiring a part time mechanic to work on the vehicles after the regular mechanic has finished his work day.

Project Goal

Determine the effect of extending the work day by 2, 4, 8, and 10 hours to see the effect on keeping the police cars available.

Output

To measure the performance of the garage, output of interest includes

• the average number of police cars serviced in a day and

• the average time a police car resides in the garage from arrival to completion of the servicing.

SUI Details

The city is not large; as a result, the garage is equipped with only one service bay, and employs only one mechanic. This means that service can be performed on only one vehicle at a time. All of the city-owned vehicles are regularly scheduled to come in to the garage for maintenance work. Vehicles scheduled to come in on a given day are all left at the garage at the end of the preceding day. They are therefore already waiting at the garage when each work day begins. A work day itself consists of 8 hours.

Under certain conditions, regularly scheduled maintenance work which is in-progress can be interrupted, so that the service bay can be used for a more important purpose. In particular, the city attempts to keep a full fleet of police cars operating at all times. The police cars are in use 24 hours per day, under demanding conditions. Whenever there is a problem with one of these cars, the car is brought immediately to the garage for unscheduled service. If another vehicle is undergoing scheduled maintenance at the time, the just-arrived police car is permitted to preempt the service bay, so that its repair can begin without delay. However, a police car in need of unscheduled repair is not permitted to preempt another police car on which unscheduled repair is in progress. Of course, if the garage is not open when they arrive, they must wait until 8 am before servicing can begin.

Mechanical Engineering, Engineering

  • Category:- Mechanical Engineering
  • Reference No.:- M9532081

Have any Question?


Related Questions in Mechanical Engineering

The aim of the project is to demonstrate certain aspects of

The aim of the project is to demonstrate certain aspects of engineering materials in different applications. The projects will be assessed on the basis of a written Research Report. The report should clearly show what yo ...

Force exerted by jet on moving cart1 you need to determine

Force Exerted By Jet On Moving cart. 1. You need to determine the velocity of water that comes out from the nozzle of this system. need the equation please formulate the equation. 2. This water will strike a small cart a ...

Mechanical engineering assignment task - solve the given

Mechanical Engineering Assignment Task - Solve the given problem. Task 1 - A spring with a one-turn loop of 40mm mean radius is formed from a round section of wire having 5 mm diameter. The straight tangential legs of th ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Heat transfer and combustionyou will need graph paper a

HEAT TRANSFER AND COMBUSTION You will need graph paper, a calculator, a copy of Appendix 1 from lesson HTC - 4 - 2 and access to steam tables to answer this TMA. 1. A fuel gas consists of 75% butane (C 4 H 10 ), 10% prop ...

Assignment -q1 explain the difference between the

Assignment - Q1. Explain the difference between the metacentric height of a ship during 'Partially Afloat condition and 'Free Floating' condition; aid a sketch to support your answer. Q2. With the aid of sketches, explai ...

Materials behaviour from atoms to bridges assignment -

Materials Behaviour from Atoms to Bridges Assignment - Distributed loads and static equilibrium (Please note: you should show your steps with necessary figures) Q1. Two beam sections are jointed at C and supported at A b ...

Questions -q1 a qualitative estimate of the effect of a

Questions - Q1. A qualitative estimate of the effect of a wind-tunnel contraction (Figure) on turbulent motion can be obtained by assuming that the angular momentum of eddies does not change through the contraction. Let ...

Assignment - machine learning for signal processingproblem

Assignment - Machine Learning for Signal Processing Problem 1: Instantaneous Source Separation 1. As you might have noticed from my long hair, I've got a rock spirit. However, for this homework I dabbled to compose a pie ...

Problem -a long pipe od 1413 mm id 1318 mm kp 20 wmk

Problem - A long pipe (OD = 141.3 mm, ID =131.8 mm, k p = 20 W/m.K) supplies hot pressurized liquid water at 400 K to a heater in a factory. The pipe has an insulation thickness of 100 mm. A new efficient heater replaces ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As