A Chicago-based international air carrier plans to purchase a jumbo-class aircraft (Airbus A-340-600 or B777-200IGW) to serve the Chicago-London city pair. Restrictions in landing slots at Heathrow airport in London allowed the purchase of five landing/takeoff slots, one per weekday (Monday through Friday). The carrier does not intend to offer weekend service. Therefore, the carrier will offer daily round-trip flights Monday through Friday. The following table presents passenger demand estimates and fares charged by competitors:

TRIP weekly demand Fare
Chicago-London-Chicago 855 $1075
Chicago-London (one way) 240 825
London-Chicago-London 910 1150
London-Chicago (one way) 380 940

The airline company estimates that the average passenger load will be 94.5 percent, due to fluctuations in the demand for travel. Estimated passenger revenue should be calculated by proportionally assigning passengers from the different fare categories. Calculate the revenue for each direction (it will most likely be different).

The round trip Chicago-London-Chicago is 8100 miles and the aircraft choices and respective costs are as follows:

Aircraft Seating Operating Annual Fixed
Capacity cost per cost
seat-mile
B777-200IGW 310 10.8 cents $19.5 million
A340-600 380 11.75 cents $22.0 million


Can the airline operate at a profit using the B777-200IGW? How much profit or loss (per week) is realized using the B777-200IGW?

Can the airline operate at a profit using the A340-600? How much profit or loss (per week) is realized using the A340-600?

What Load Factor (percent of seats occupied) is required to break even using the B777-200IGW?

What Load Factor (%) is required to break even using the A340-600?

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M9892439

Have any Question?


Related Questions in Civil Engineering

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

1 aimthe assignment aims to develop the ability to analyse

1. Aim The assignment aims to develop the ability to analyse, evaluate, research plan and manage a major building project through individual and group participation (ideally 4-6 people).Refer to vUWS for the DA plans and ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As