1. The third unit of an aircraft hangar project was completed in 2700 hours. The fifteenth unit was built in 2100 hours. What is the learning rate (based on doubled units)? How long would it take to build the hundredth unit?
2. A tower (the first one) was installed in 900 hours. The improvement rate for doubled units is expected to be 90%.
a. What will be the time required to complete the fifth tower?
b. The thirtieth tower?
3. The "A" value for 5 sluice gate installations was 160 hours (learning 0.90 for doubled averages). Find the average time to install 25 sluice gates. What is the time required to install the twentieth sluice gate?
4. The cumulative average time for constructing 30 electrical assemblies is 170 hours. The rate of learning for doubled averages is about 0.95.
a. How much time was consumed in building the fiftieth unit?
b. What was the total time required for all units after 100 units were completed?
c. What total hours were needed to assemble units 100 through 150?
5. The learning rate of 0.90 on cumulative averages is realized when constructing metal storage tanks. The first unit took 1400 hours to construct. After 6 units were constructed, the hunting season opened and the entire work crew took off a total of 5 days.
a. Ignoring the impact of weekends, determine the time required to complete units 7 through 12.
b. If wages are $10 per hour, what was the cost of the hunting season in terms of lost productivity?
6. A learning rate of 92% on cumulative averages is realized when constructing metal storage tanks. The first tank took 1200 hours to construct. After 6 tanks were constructed, the work was stopped for two days, after which the work was resumed. Find the time required to complete units 7 through 10.
a. If wages are $15 per hour, what was the cost of the delay from lost productivity?
b. What was the total cost of constructing 15 tanks?
7. Study the following data: unit #1, labor cost/unit of $1000; unit #5, labor cost/unit of $900; and unit #25, labor cost/unit of 4810. Based on the trend of production costs on these units, develop a formula that will be usable to predict future costs; that is, find the value of s. Find the cost for unit 100.
8. A contractor has kept accurate records on the installation of pressure vessels in a refinery. She has the following data: Unit # 3, A = 1530; Unit #4, A = 1450; Unit #7, A = 1370; Unit #10, A = 1325; Unit #12, A= 1300; Unit#15, A= 1275. A strike delayed further installations for two weeks (16 days), before the 16th unit could be installed. The contractor had a crew size of 11 workers who receive an average wage of $18 per hour. The rental on the equipment and the company overhead is $500 per day. The contractor noted that she broke even after having completed the eighth unit.
a. Find the theoretical time to complete the first unit.
b. Find the learning rate (in percent).

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91046940

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As