1) PCBs are regulated under which law? List PCB classifications with concentrations.

2) Describe the disposal requirements for transformers, capacitors, containers, and liquids. Is manifesting required for PCB disposal?

3) Detail the spill reporting requirements for PCB spills.

4) Which law studied this term is the most burdensome to environmental managers and why?

Use the following scenario to answer questions 5, 6, and 7. Give detailed answers.

Introduction

Fabricating printed wiring boards (PWB) involves a variety of different processes that are divided into two categories: dry and wet fabrication.

Dry fabrication is composed of drilling, routing, and imaging; whereas wet fabrication is composed of scrubbing, developing, plating, and etching. This study focuses only on the wet processes and the associated problems relative to environmental stewardship. This shop had much to learn about environmental responsibility and natural resource conservation. The past processes of the shop were not a deliberate "nose-thumbing" attitude toward the environment and natural resources; but rather it was brought about by lack of knowledge and awareness. All of the chemicals involved in wet processing are hazardous to some degree. These hazards revolve around the properties of the chemicals.

For example, strong mineral acids are extremely corrosive and the vapors readily degrade most metals on contact. Inhalation of these vapors can cause a range of problems such as slight respiratory irritation, pulmonary edema, and death. All these hazards can be reduced or even eliminated from the work place by engineering and administrative controls. Engineering controls include proper ventilation and material substitution. Administrative controls include Standard Operating Procedures (SOP) and training. Personal protective equipment (PPE) is used when the hazard hasn't been eliminated from the workplace.

Past Operation Practices

Processing

The processes of environmental concern were electroless copper deposition, electrolytic copper plating, and electrolytic tin/lead or solder plating. All of the plating shop rinses consisted of tap water overflow that were discharged directly into an Industrial Sewer System (ISS). The initial processing flow rates were approximately 2,000 gallons/hour. Contained within this substantial rinse discharge were regulated materials  (i.e., copper, tin, lead, and formaldehyde). Scrubbing and deburring equipment used to process PWB panels was plumbed to discharge directly into the ISS. This discharge was approximately 12 gallons/minute and contained copper particles along with fibrous material from the scrubber wheels.

The photoresist developer and stripper used in the imaging process were also plumbed to discharge directly into the ISS with approximately 6 gallons/minute of outflow. Alkaline effluent in the imaging process contained residual organic material in solution and suspended particles.Temperature control was a critical parameter in many of the steps involved in fabricating PWBs.

Maintaining predetermined temperature parameters was accomplished with tap water circulation. All of the cooling water was discharged into the ISS. There were no recycling steps practiced. The etchers, developer, lamination press, and vapor degreasers required tap water cooling to control the temperature. During normal operations, approximately 8,000 gallons of noncontact cooling water was used weekly. (Water usage fluctuated depending on the temperature of the ground water.)

Hazardous Materials

Materials used in the wet fabrication processes are hazardous. The chemicals employed can be categorized into three groups: oxidizers, corrosives, and toxins.

1. Oxidizers are materials that readily oxidize substances with which they come into contact. An example is chlorine gas, which was used to regenerate an etching system. The etchant was chemically reduced as copper was removed from the PWB panel. Chlorine gas was used to reoxidize the etchant and restore etching ability.

2. Corrosive materials include acids, bases, and halogens. Each of these materials could cause corrosion on substances with which they come into contact. (An example of this is the effect that strong mineral acid vapors have on metals and respiratory systems.)

3. Toxins include toxic materials, irritants, carcinogens, and asphyxiants. These materials are known to have an adverse effect on humans. Most of the chemicals used in the fabrication of PWBs possessed one or more of these undesirable properties. Since there was a great concern for protecting the personnel exposed to these substances, it was extremely important that the PPE be properly used. The solution employed to etch copper without destroying the tin/lead plated pattern was chrome trioxide and sulfuric acid. The etching solution was heated to 120oF in a conveyorized spray module and was used until spent. Waste products were then transferred into drums, labeled, manifested, and sent to waste disposal. (The main component, chrome trioxide, is a known carcinogen and exposure to this compound has been documented to cause lung cancer.)

The solvent used to remove dryfilm photoresist was methylene chloride, a suspected carcinogen. Removal was accomplished by placing a large solvent-resistant tray in an open sink and adding solvent. A number of panels were then placed in the solution and allowed to soak for several minutes. During this dwell time, the photoresist blistered and floated free of the panel surface.

The panels were then withdrawn from the tray and held under running water to rinse the residual solvent into the Domestic Sewer System (DSS). A liquid photoimagable resist was used to fabricate fine line circuitry. This resist was a xylenebased material formulated with hotosensitive compounds. The resist was applied by pumping the compound onto a set of rollers which, in turn, was deposited onto the panels being processed. After each use, the equipment had to be cleaned by wiping the soiled areas with xylene. (Xylene is a chemical suspected of damaging bone marrow, thus causing anemia.).

As California was experiencing a 7-year drought a hard look was taken into operation practices.

5) Describe how you would manage this waste stream. Be specific in approaches and include personnel aspects. What law regulates this material?

6) Describe some waste minimization techniques that could be used for this waste stream. Keep in mind that water is scarce.

7) What HW characteristics do the materials used in this process have?

Science, Academics

  • Category:- Science
  • Reference No.:- M91571210
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Science

Physiology signature assignment -for your signature

Physiology: Signature Assignment - For your signature assignment, compose a 3- to 4-page case analysis (in addition to a title, abstract, and a reference page) written in APA format with at least 3 references, with one n ...

Course descriptionthis course provides an opportunity for

Course Description This course provides an opportunity for nursing students to enhance their knowledge of historical and contemporary issues relevant to Aboriginal and Torres Strait Islander people. This course will expl ...

Individual work - personal reflectionreflect on the roles

Individual work - personal reflection Reflect on the roles you performed in this group task and reflect on the ways you impacted on the group. Describe some of the things that you did that were helpful to the group. Desc ...

A do research or find a peer-reviewed scholarly journal

A. Do research or find a peer-reviewed, scholarly journal article that is related to leadership and motivation with emphasis on morality, write a short summary of the content of the article. If it is not a scholarly jour ...

Rationalesafety and risk management are critical aspects of

Rationale Safety and Risk Management are critical aspects of a workplace and breaches are punishable under Work Health and Safety Law. This task encourages students to analyse and conceptualise responses to safety breach ...

Rationalesafety and risk management are critical aspects

Rationale Safety and Risk Management are critical aspects of a workplace and breaches are punishable under Work Health and Safety Law. This task encourages students to analyse and conceptualise responses to safety breach ...

Midterm exam questions -q1 you are asked to evaluate a

Midterm Exam Questions - Q1. You are asked to evaluate a construction/building project in an area corresponding to the sketch map below. The area has mildly hilly topography and thin soil cover. The bedrock in area X is ...

Assignment -in addition to turning in your isite journal

Assignment - In addition to turning in your iSite journal entry as usual, a short paper with emphasis on writing in a scientific format, properly acknowledging resources, and an overview of the process of thermoregulatio ...

Critical appraisal requirementscritically appraise review

Critical appraisal requirements Critically appraise (review) the literature pertaining to human factors related to work performance and critically analyse the relationship between these and quality and safety in health c ...

Question in a 3 page paper compare and contrast food

Question: In a 3 page paper compare and contrast food insecurity issues in urban environments vs. rural environments. Discuss the role of food security as compared to food justice. The response must be typed, single spac ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As