Ask Civil Engineering Expert

1. Discuss the guiding principles of Passive House and how they are used as a metric of sustainability in building performance. What are some pros and cons to using Passive House. Do you agree or disagree with the five barriers that the article discusses with respect to using Passive House in the US? How does the Passive House approach align with Fenner et al.'s eight point sustainability framework? Which of the eight points does it address and which does it not?

2. Calculate the R-value for the following wall assembly. This calculation should be done by hand, on engineering paper, and handed in during class (or scanned and submitted online).

3. Use the simplified Passive House Planning Package (PHPP) from Hammer & Hand to examine the annual heating demand of your home from Homework #4. The geometry and window area are set by your Revit model, but you can play with different R values of the walls, floors, foundations, and doors. Using realistic R values (see references below), provide annual heating demand values for a low, mid, and high efficiency home. Did your building geometry limit how energy efficient you could get?

a. Assume that your foundation wall is 3 feet tall and 8 inch thick concrete, and runs around the circumference of your home.
b. Assume an R-value of 10, 15, and 20 for your attic, vaulted roof, and slab for your low, mid, and high efficiency homes, respectively.
c. Remember that in order to be considered a Passive House, your annual heating demand must be below 4.75 kbtu/sf/yr (as a target for your high efficiency home)
d. References:

4. Discuss LEED as a metric for determining the sustainability of buildings from the Fenner et al. sustainability framework. In what ways does it address sustainability (which points are addressed) and in which ways does it not (which points are left out)?

161_Discuss the guiding principles of Passive House.png

Civil Engineering, Engineering

  • Category:- Civil Engineering
  • Reference No.:- M91031861

Have any Question?


Related Questions in Civil Engineering

Assignment -ewb design report format - cover page - the as

Assignment - EWB Design Report Format - Cover page - The as EWB project Table of content Introduction about -EWB and CRDT (Cambodian Rural development team) Background about Cambodia - Economic, Weather, People - living ...

Assessment taskpractical investigationinstructions- it is

Assessment Task Practical Investigation Instructions: - It is very important that you read these instructions. - The hardcopy of the Assignment report, with the Assignment cover sheet, should be submitted to the Assignme ...

Task details the client is doing masters in civil

Task Details: The client is doing Masters in Civil Engineering. He needs a Technical Paper on Earthquake pertaining to Geology and Rock Mechanics. There should be a through discussion of Earthquake in relation to the men ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Masonry design assignmentquestion 1 - derivation of seismic

MASONRY DESIGN ASSIGNMENT Question 1 - Derivation of seismic actions on building a) Determine the storey seismic weights (Wi) for each suspended level of the building, hence the seismic weight (Wt) of the entire building ...

Aimthis assignment aims to demonstrate the structural

Aim: This assignment aims to demonstrate the structural design requirements of a glazed façade in a multi-storey building. Among other requirements, the glazed façade is required to comply with Australian Standard AS 204 ...

Assignmenta continuous three spans beam with

Assignment A continuous three spans beam with centre-to-centre distance of 6 m supports 150 mm thick one-way slabs as shown below. The beams have clear spans of 8 m, 9 m, and 8 (face-to-face of 400 mm square columns). Th ...

The drainage system of a cantilever wall shown in below

The drainage system of a cantilever wall shown in below figure, became blocked after a heavy rainstorm and the groundwater level, which was originallybelow the base, rose to1.5 (m) below the surface. Determine the stabil ...

Civilyou are provided with bill of quantities prepared

Civil You are provided with bill of quantities prepared separately, priced and submitted by 3 con- tractors (A,B,C found on LMS) in respect of a proposed project (see appendix for drawings). The site is located on Mt. Al ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As